RACHMAWATI, BETA HUSDA NUR and , Mochammad Solikin, S.T, M.T., Ph.D (2021) Analisis Kegagalan Dalam Keikutsertaan Lelang Pada Pekerjaan Jalan Dan Gedung Oleh Divisi Marketing Pt Surveyor Indonesia (Persero). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Naskah Publikasi.pdf Download (746kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (457kB) |
|
PDF (Bab I)
BAB I PENDAHULUAN.pdf Download (167kB) |
|
PDF (Bab II)
BAB II PROFIL PERUSAHAAN.pdf Restricted to Repository staff only Download (223kB) |
|
PDF (Bab III)
BAB III LANDASAN TEORI.pdf Restricted to Repository staff only Download (219kB) |
|
PDF (Bab IV)
BAB IV LAPORAN PELAKSANAAN MAGANG OK.pdf Restricted to Repository staff only Download (161kB) |
|
PDF (Bab V)
BAB V PEMBAHASAN.pdf Restricted to Repository staff only Download (242kB) |
|
PDF (Bab VI)
BAB VI KESIMPULAN DAN SARAN NEW.pdf Restricted to Repository staff only Download (87kB) |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (83kB) |
|
PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN PUBLIKASI.pdf Restricted to Repository staff only Download (213kB) |
Abstract
Procurement of goods and services or known as auctions are widely conducted by government and private agencies. The problem that occurs in the auction is the failure to win a project.This study aims to determine the causes of project failure in technical evaluation, administrative evaluation and price bidding. The survey data obtained were then analyzed by comparing the percentage of roadwork failures with the percentage of building failures.The results of the analysis for the percentage of road failures obtained data of 43% on the technical evaluation, 30% for the administrative evaluation, and 15% for the price bidding. Meanwhile, the percentage of failure in building works is 36% for technical evaluation, 37% for administrative evaluation, and 15% for price bidding. The predominant failures of road and building works are found in the technical and administrative evaluations.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Failure, Percentage, Evaluation |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | BETA HUSDA NUR RACHMAWATI |
Date Deposited: | 02 Jun 2021 03:48 |
Last Modified: | 02 Jun 2021 03:48 |
URI: | http://eprints.ums.ac.id/id/eprint/91262 |
Actions (login required)
View Item |