Pamungkas, Danar Tri and , Amin Sulistyanto S.T, M.T (2020) Proses Assembly Base Frame, Upper Frame, Total Assembly Excava 200. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (790kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (761kB) |
|
PDF (Bab I)
BAB I.pdf Download (1MB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (506kB) | Request a copy |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (114kB) |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (13MB) | Request a copy |
|
PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN PUBLIKASI.pdf Restricted to Repository staff only Download (273kB) | Request a copy |
Abstract
Excava 200 is the first excavator product produced by PT. Pindad. Excavator production is done in the Heavy Equipment Division of PT. Pindad. The inaugural launch of the Pindad Excava 200 was carried out on September 10, 2015 at the head office of PT. Pindad Bandung.This excavator has gone through a testing process from PT. Sucofoindo which covers the scope of work and function tests and is declared to meet the requirements and has received SNI certificates. The purpose of this paper is to know the entire Pindad Excava 200 assembly process starting from the basic framework, top frame, total assembly to the testing process. From the results during the author's direct observation and carrying out the various methods mentioned above, the author found several excava 200 product processing sequences that were not in accordance with the existing process sequence sheet, and affected obstacles and mismatches in the production process sequence. There are several objectives to get a better work process including considering all alternative materials used, process completion according to function, service reliability and time, considering all alternative processes and processing methods. Possible improvements by removing, combining, adding and simplifying operations
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | excavator, component, assembly |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Fakultas Teknik > Teknik Mesin |
Depositing User: | DANAR TRI PAMUNGKAS |
Date Deposited: | 07 Mar 2020 04:51 |
Last Modified: | 07 Mar 2020 04:51 |
URI: | http://eprints.ums.ac.id/id/eprint/82333 |
Actions (login required)
View Item |