Adi Pradana, Bagas and , Ika Setiyaningsih, ST., MT. (2022) Studi Literatur Kinerja Ruas Jalan Pada Perlintasan Sebidang. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN.pdf Restricted to Repository staff only Download (81kB) |
|
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (609kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (423kB) |
|
PDF (Bab I)
BAB I.pdf Download (115kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (207kB) |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (217kB) |
|
PDF (Bab IV)
BAB IV.pdf Download (127kB) |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (65kB) |
|
PDF (Bab VI)
BAB VI.pdf Restricted to Repository staff only Download (63kB) |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (98kB) |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (451kB) |
Abstract
Crossing a plot of highway and railroad traffic problems often occur. Traffic problems are caused by increasing population mobility, changes in land use, and economic changes, which are not balanced with the development of traffic facilities and infrastructure. The existence of crossing a plot of road with the railroad causes an obstacle caused by the presence of rumble strips, when entering the crossing where the driver is forced to reduce his speed so that the density that occurs is higher. As a result of crossing a plot of road with the railroad, this not only results in queues and delays at the crossing gate, resulting in a decrease in the quality of road performance around level crossings. The data used in the form of primary data obtained by previous researchers consisted of traffic flow, queue length, and delays. This study was analyzed using the literature study method. The larger the incoming vehicles and the longer the duration of closing the railroad crossing doors, the longer the time and queue length and the delay experienced by vehicle drivers will be greater.
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | road section performance, queue length, delay, railway crossing |
Subjects: | T Technology > TC Hydraulic engineering. Ocean engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | BAGAS ADI PRADANA |
Date Deposited: | 25 May 2022 13:32 |
Last Modified: | 25 May 2022 13:34 |
URI: | http://eprints.ums.ac.id/id/eprint/100675 |
Actions (login required)
View Item |