Studi Literatur Kinerja Ruas Jalan Pada Perlintasan Sebidang

Adi Pradana, Bagas and , Ika Setiyaningsih, ST., MT. (2022) Studi Literatur Kinerja Ruas Jalan Pada Perlintasan Sebidang. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN.pdf
Restricted to Repository staff only

Download (81kB)
[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (609kB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (423kB)
[img] PDF (Bab I)
BAB I.pdf

Download (115kB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (207kB)
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (217kB)
[img] PDF (Bab IV)
BAB IV.pdf

Download (127kB)
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (65kB)
[img] PDF (Bab VI)
BAB VI.pdf
Restricted to Repository staff only

Download (63kB)
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (98kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (451kB)

Abstract

Crossing a plot of highway and railroad traffic problems often occur. Traffic problems are caused by increasing population mobility, changes in land use, and economic changes, which are not balanced with the development of traffic facilities and infrastructure. The existence of crossing a plot of road with the railroad causes an obstacle caused by the presence of rumble strips, when entering the crossing where the driver is forced to reduce his speed so that the density that occurs is higher. As a result of crossing a plot of road with the railroad, this not only results in queues and delays at the crossing gate, resulting in a decrease in the quality of road performance around level crossings. The data used in the form of primary data obtained by previous researchers consisted of traffic flow, queue length, and delays. This study was analyzed using the literature study method. The larger the incoming vehicles and the longer the duration of closing the railroad crossing doors, the longer the time and queue length and the delay experienced by vehicle drivers will be greater.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: road section performance, queue length, delay, railway crossing
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: BAGAS ADI PRADANA
Date Deposited: 25 May 2022 13:32
Last Modified: 25 May 2022 13:34
URI: http://eprints.ums.ac.id/id/eprint/100675

Actions (login required)

View Item View Item