Investigasi Faktor Dominan Penyebab Cost Overrun Proyek Konstruksi Jalan Oleh Kontraktor PT. Istaka Karya (PERSERO)

Erhassa, Sakinata Zhahrina Ramadhani and , Mochammad Solikin, S.T, M.T., Ph.D (2021) Investigasi Faktor Dominan Penyebab Cost Overrun Proyek Konstruksi Jalan Oleh Kontraktor PT. Istaka Karya (PERSERO). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (1MB)
[img] PDF (Bab I)
BAB I.pdf

Download (219kB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (349kB)
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (816kB)
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (170kB)
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (1MB)
[img] PDF (Bab VI)
BAB VI.pdf

Download (261kB)
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (93kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (6MB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (1MB)
[img] PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN PUBLIKASI .pdf

Download (120kB)

Abstract

In the road construction project implementation stage by PT. Istaka Karya, there are often problems and differences in what has been done in the field and what has been planned beforehand, so that the contractor often faces problems, such as delays in work during implementation and cost overrun. Therefore, this study aims to determine what factors are causing cost overruns and also the amount of cost overruns in road construction projects experienced by the contractor company PT. Istaka Karya. This research was conducted by distributing questionnaires to contractor staff who were involved in handling the road project as respondents to the questionnaire. The analysis in this study was assisted by using the SPSS (Statistical Product and Service Solutions) application. Based on the analysis that has been carried out in this study, there are dominant factors that influence the cost overrun in road construction projects, namely Material (X4), and Project Financial Aspects (X7). Often late and material shortages at the time of implementation are the reasons why material factors can be the main factor causing cost overruns in road construction projects at the contractor company PT. Istaka Karya. In addition, the subcontractor's lack of capacity in terms of funding is also the reason why the project's financial aspects are a major factor in the cost overrun. Based on the answers from the respondents, it can be concluded that the cost overrun in road construction projects at PT. Istaka Karya ranges from 1%-20%, but there are a few projects that experience a cost overrun of 20%.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: cost, dominant factor, cost overrun, road construction, spss
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: SAKINATA ZHAHRINA RAMADHANI ERHASSA
Date Deposited: 04 Jun 2021 04:11
Last Modified: 08 Jun 2021 02:31
URI: http://eprints.ums.ac.id/id/eprint/91348

Actions (login required)

View Item View Item