Ismail, Andy and Hamid Abdillah,, S.T., M.T. and Emi Erawati,, S.T,. M.Eng (2016) PRARANCANGAN PABRIK ETILEN OKSIDA DARI ETILEN DENGAN PROSES OKSIDASI KAPASITAS 150.000 TON/TAHUN. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (371kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (993kB) |
|
PDF (Bab I)
BAB I.pdf Download (582kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab III)
BAB III FIX.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab VI)
BAB VI.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab VII)
BAB VII.pdf Restricted to Repository staff only Download (574kB) | Request a copy |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (27kB) |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN PUBLIKASI KARYA ILMIAH.pdf Restricted to Repository staff only Download (341kB) | Request a copy |
Abstract
Pre-draft Factory ethylene oxide oxidation process with capacity of 150,000 tons / year in operation for 330 days per year. Factory will be established in the industrial area Cilegon, Banten with 9.705 m2 land area and 124 employees. The raw material ethylene form PT. Chandra Asri Petrochemical, Cilegon and Oxygen from PT. Air Liquide Indonesia, Cilegon. Making the reaction of ethylene oxide oxidation process using fixed bed multitube reactor with silver catalysts. On phase gases, irreversible, with exothermic temperature from 220 to 252.6°C and pressure 15 atm. The resulting product side carbon dioxide and air. Raw materials production of ethylene oxide needs ethylene amounted 117.990 tons / year and oxygen amounted to 74.914 tons / year. Process supporting utilities include the air supply unit amounted to 108.3 m3 / day, steam unit amounted to 536.7 m3 / day be produced from boiler with diesel fuel used to 117.9 ft3 / hour, unit power needs power of 1263.68 kWh be produced from PLN, and waste treatment unit. The result of the economic ethylene oxide using fixed capital Rp. 314 644 880 961. Advantages per year before tax Rp 2,478,140,104,505, profit per year after tax Rp 1,982,512,083,604, Return of Investment (ROI) after tax 49.9% and 39.1%, Pay Out Time (POT) before tax 1.72 years and after tax of 2.08. Economic analysis with Break Even Point and Shut Down Point 53% and 42%. So plant can be established because Pay Out Time and after 2.08 years.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | etilen oksida, fixed bed multitube reactor, oksidasi |
Subjects: | T Technology > TP Chemical technology |
Divisions: | Fakultas Teknik > Teknik Kimia |
Depositing User: | ANDY ISMAIL |
Date Deposited: | 10 Oct 2016 10:28 |
Last Modified: | 10 Oct 2016 10:31 |
URI: | http://eprints.ums.ac.id/id/eprint/46678 |
Actions (login required)
View Item |