PRARANCANGAN PABRIK ETILEN OKSIDA DARI ETILEN DENGAN PROSES OKSIDASI KAPASITAS 150.000 TON/TAHUN

Ismail, Andy and Hamid Abdillah,, S.T., M.T. and Emi Erawati,, S.T,. M.Eng (2016) PRARANCANGAN PABRIK ETILEN OKSIDA DARI ETILEN DENGAN PROSES OKSIDASI KAPASITAS 150.000 TON/TAHUN. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (371kB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (993kB)
[img] PDF (Bab I)
BAB I.pdf

Download (582kB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab III)
BAB III FIX.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab VI)
BAB VI.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab VII)
BAB VII.pdf
Restricted to Repository staff only

Download (574kB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (27kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN PUBLIKASI KARYA ILMIAH.pdf
Restricted to Repository staff only

Download (341kB) | Request a copy

Abstract

Pre-draft Factory ethylene oxide oxidation process with capacity of 150,000 tons / year in operation for 330 days per year. Factory will be established in the industrial area Cilegon, Banten with 9.705 m2 land area and 124 employees. The raw material ethylene form PT. Chandra Asri Petrochemical, Cilegon and Oxygen from PT. Air Liquide Indonesia, Cilegon. Making the reaction of ethylene oxide oxidation process using fixed bed multitube reactor with silver catalysts. On phase gases, irreversible, with exothermic temperature from 220 to 252.6°C and pressure 15 atm. The resulting product side carbon dioxide and air. Raw materials production of ethylene oxide needs ethylene amounted 117.990 tons / year and oxygen amounted to 74.914 tons / year. Process supporting utilities include the air supply unit amounted to 108.3 m3 / day, steam unit amounted to 536.7 m3 / day be produced from boiler with diesel fuel used to 117.9 ft3 / hour, unit power needs power of 1263.68 kWh be produced from PLN, and waste treatment unit. The result of the economic ethylene oxide using fixed capital Rp. 314 644 880 961. Advantages per year before tax Rp 2,478,140,104,505, profit per year after tax Rp 1,982,512,083,604, Return of Investment (ROI) after tax 49.9% and 39.1%, Pay Out Time (POT) before tax 1.72 years and after tax of 2.08. Economic analysis with Break Even Point and Shut Down Point 53% and 42%. So plant can be established because Pay Out Time and after 2.08 years.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: etilen oksida, fixed bed multitube reactor, oksidasi
Subjects: T Technology > TP Chemical technology
Divisions: Fakultas Teknik > Teknik Kimia
Depositing User: ANDY ISMAIL
Date Deposited: 10 Oct 2016 10:28
Last Modified: 10 Oct 2016 10:31
URI: http://eprints.ums.ac.id/id/eprint/46678

Actions (login required)

View Item View Item