Mulyanto, Eko and , Dr. Sumardi, M.Si and , Dr. Suyatmini, M.Si (2016) Pengelolaan Bengkel Teknik Mekatronika SMK Negeri 2 Sukoharjo Tahun 2016. Thesis thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (1MB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (1MB) |
|
PDF (Bab I)
BAB I.pdf Download (231kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (270kB) |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (171kB) |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (163kB) |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (358kB) |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (5MB) |
|
PDF (Surat Pernyataan)
SURAT KETERANGAN PUBLIKASI ILMIAH.pdf Restricted to Repository staff only Download (11kB) |
Abstract
The purpose of this study is (1). Describe the procurement of equipment and materials in the workshop practices Mechatronics SMK Negeri 2 Sukoharjo. (2). Describing the use of tools and materials in the workshop practices Mechatronics SMK Negeri 2 Sukoharjo. (3). Describe Maintenance of tools and materials in the workshop practices Mechatronics SMK Negeri 2 Sukoharjo. The research was conducted at SMK Negeri 2 Sukoharjo. This type of research is qualitative research with a naturalistic approach. The technique of collecting data through observation, interviews and documentation. The study design using the design ethnography. The informant as a resource is the principal, vice-principal fields of infrastructure, head of engineering packages mechatronics and mechatronic engineering practice teacher. The collected data was then analyzed by means of data reduction, presentation / display data and drawing conclusions / verification. Testing the validity of using, triangulation source and triangulation techniques. Research result are showing that the procurement of equipment and materials may gradually be met by the school. The Central Government provides financial assistance, in the form of deconcentration fund is realized through the proposal and verification proposal. The use of mechatronic engineering workshop solely for practical learning process to improve students' skills. Program activities in mechatronic engineering workshop include the provision, use and maintenance of tools and materials. Based on the findings of this research for the procurement of mechatronic engineering workshop equipment is good, need to conduct equipment maintenance technicians and are designed to be held periodically or periodic maintenance. Similarly, for an inventory of equipment and materials showed the results have not oftimal due to the lack of space for storage of tools and materials. Keywords: management, procurement, use and maintenance materials
Item Type: | Karya ilmiah (Thesis) |
---|---|
Uncontrolled Keywords: | pengelolaan, pengadaan, penggunaan dan pemeliharaan alat bahan |
Subjects: | L Education > LB Theory and practice of education > LB1603 Secondary Education. High schools |
Divisions: | Fakultas Pasca Sarjana > Magister Administrasi Pendidikan |
Depositing User: | MULYANTO |
Date Deposited: | 13 Oct 2016 08:08 |
Last Modified: | 13 Oct 2016 08:08 |
URI: | http://eprints.ums.ac.id/id/eprint/46632 |
Actions (login required)
View Item |