Darwanto, Dedi and , Ir. H. Muhammd Nur Sahid, MM., MT. and , Jaji Abdurrosyid, ST., MT. (2016) Analisis Pengaruh Genangan Air Lingkungan Pada Pelaksanaan Proyek Hotel Harris & Pop! Solo Terhadap Biaya (Studi Kasus Proyek Hotel Harris & Pop! Solo). Diploma thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Naskah Publikasi.pdf Download (587kB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (2MB) |
|
PDF (BAB I)
BAB I.pdf Download (165kB) |
|
PDF (BAB II)
BAB II.pdf Restricted to Repository staff only Download (108kB) | Request a copy |
|
PDF (BAB III)
BAB III.pdf Restricted to Repository staff only Download (742kB) | Request a copy |
|
PDF (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (166kB) | Request a copy |
|
PDF (BAB V)
BAB V.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (BAB VI)
BAB VI.pdf Restricted to Repository staff only Download (89kB) | Request a copy |
|
PDF (Daftar Pustaka)
Daftar Pustaka.pdf Download (79kB) |
|
PDF (Lampiran)
Lampiran.pdf Restricted to Repository staff only Download (3MB) | Request a copy |
|
PDF (Surat Pernyataan Publikasi Ilmiah)
Surat Pernyataan Publikasi Ilmiah.pdf Restricted to Repository staff only Download (438kB) | Request a copy |
Abstract
With more hotel building in Solo caused a little bit space for hotel parking lot. Therefore need a place which adequate and function for parking lot in the hotel building. Basement is one of alternative way which function as parking lot. In the making of basement need a process excavation with certain elevation under ground surface. Generally the problem which appear in excavation implementation in making of basement is ground water existence at excavation area. One of technique to keep excavation area in dry condition with using groundwater control system or dewatering. Dewatering method which be used is predrainage and open pumping . Predrainage method working with use submersible pump which pump 1035,2 litre of water mean while open pumping method working with soak pump which pump debit water plan as 1684,80 litre/minute. Total cost analysis of dewatering is Rp 454.896.604,00 and calculation of total cost from contractor is Rp 483.400.000,00
Item Type: | Karya ilmiah (Diploma) |
---|---|
Uncontrolled Keywords: | ground water, dewatering, basement, pump |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | DEDI DARWANTO |
Date Deposited: | 10 Aug 2016 04:05 |
Last Modified: | 10 Aug 2016 04:05 |
URI: | http://eprints.ums.ac.id/id/eprint/45062 |
Actions (login required)
View Item |