Analisis Pengaruh Genangan Air Lingkungan Pada Pelaksanaan Proyek Hotel Harris & Pop! Solo Terhadap Biaya (Studi Kasus Proyek Hotel Harris & Pop! Solo)

Darwanto, Dedi and , Ir. H. Muhammd Nur Sahid, MM., MT. and , Jaji Abdurrosyid, ST., MT. (2016) Analisis Pengaruh Genangan Air Lingkungan Pada Pelaksanaan Proyek Hotel Harris & Pop! Solo Terhadap Biaya (Studi Kasus Proyek Hotel Harris & Pop! Solo). Diploma thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
Naskah Publikasi.pdf

Download (587kB)
[img] PDF (Halaman Depan)
Halaman Depan.pdf

Download (2MB)
[img] PDF (BAB I)
BAB I.pdf

Download (165kB)
[img] PDF (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (108kB) | Request a copy
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (742kB) | Request a copy
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (166kB) | Request a copy
[img] PDF (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (BAB VI)
BAB VI.pdf
Restricted to Repository staff only

Download (89kB) | Request a copy
[img] PDF (Daftar Pustaka)
Daftar Pustaka.pdf

Download (79kB)
[img] PDF (Lampiran)
Lampiran.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] PDF (Surat Pernyataan Publikasi Ilmiah)
Surat Pernyataan Publikasi Ilmiah.pdf
Restricted to Repository staff only

Download (438kB) | Request a copy

Abstract

With more hotel building in Solo caused a little bit space for hotel parking lot. Therefore need a place which adequate and function for parking lot in the hotel building. Basement is one of alternative way which function as parking lot. In the making of basement need a process excavation with certain elevation under ground surface. Generally the problem which appear in excavation implementation in making of basement is ground water existence at excavation area. One of technique to keep excavation area in dry condition with using groundwater control system or dewatering. Dewatering method which be used is predrainage and open pumping . Predrainage method working with use submersible pump which pump 1035,2 litre of water mean while open pumping method working with soak pump which pump debit water plan as 1684,80 litre/minute. Total cost analysis of dewatering is Rp 454.896.604,00 and calculation of total cost from contractor is Rp 483.400.000,00

Item Type: Karya ilmiah (Diploma)
Uncontrolled Keywords: ground water, dewatering, basement, pump
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: DEDI DARWANTO
Date Deposited: 10 Aug 2016 04:05
Last Modified: 10 Aug 2016 04:05
URI: http://eprints.ums.ac.id/id/eprint/45062

Actions (login required)

View Item View Item