Implementasi Lean Manufacturing untuk Mengeliminasi Waste pada Line Perakitan Sepeda dengan Metode Value Stream Mapping

Nurdiansyah, Bagus and , Munajat Tri Nugroho, S.T., M.T., Ph.D (2025) Implementasi Lean Manufacturing untuk Mengeliminasi Waste pada Line Perakitan Sepeda dengan Metode Value Stream Mapping. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI_BAGUS.pdf

Download (697kB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (1MB)
[img] PDF (Bab I)
Bab I.pdf

Download (232kB)
[img] PDF (Bab II)
Bab II.pdf
Restricted to Repository staff only

Download (1MB)
[img] PDF (Bab III)
Bab III.pdf
Restricted to Repository staff only

Download (317kB)
[img] PDF (Bab IV)
Bab IV.pdf
Restricted to Repository staff only

Download (997kB)
[img] PDF (Bab V)
Bab V.pdf
Restricted to Repository staff only

Download (144kB)
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (164kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (297kB)
[img] PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf
Restricted to Repository staff only

Download (202kB)

Abstract

PT Roda Pasifik Mandiri is a manufacturing company engaged in bicycle production for more than 15 years. Based on production data for January - June 2024, it is known that there is instability in production output on the bicycle assembly line caused by waste. The aim of this research is to understand the production process, identify the waste that occurs and provide suggestions for reducing waste using the Value Stream Mapping (VSM) and Value Stream Analysis Tools (VALSAT) methods. Waste identification was obtained by distributing a questionnaire form on a scale of 1-5 (having no influence to the most influence) to the relevant employees and it was discovered that some of the most dominant wastes were transportation (x̄ = 3.75), waiting (x̄ = 3.66) and unnecessary inventory (x̄ = 3.41). Next, weighting was carried out using VALSAT to determine the most dominant tools for the waste reduction proposal process, namely Process Activity Mapping (37.02%), Supply Chain Response Matrix (22.63%) and Demand Amplification Mapping (14.26%) as well as fishbone diagram analysis to find the root of the problems that occurred. The research results showed a proposal for reducing waste in the bicycle assembly process with a cycle time reduction of 0.559 min/unit.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Lean Manufacturing, Value Stream Mapping, VALSAT, fishbone diagram
Subjects: T Technology > TI Industrial Engineering
T Technology > TI Industrial Engineering > TI1 Assembling
T Technology > TI Industrial Engineering > TI2 Production Process
Divisions: Fakultas Teknik > S1 Teknik Industri
Depositing User: BAGUS NURDIANSYAH
Date Deposited: 16 May 2025 03:31
Last Modified: 16 May 2025 03:31
URI: http://eprints.ums.ac.id/id/eprint/134411

Actions (login required)

View Item View Item