Maulana, Dani Irawan and , Afiqoh Akmalia Fahmi, S.T., M.Sc (2024) Analisis Persediaan Bahan Baku Menggunakan Metode Economic Order Quantity dan Period Order Quantity Di PT. Sumi Asih. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Naskah Publikasi.pdf Download (555kB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (521kB) |
|
PDF (Bab I)
BAB I.pdf Download (221kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (346kB) |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (139kB) |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (516kB) |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (147kB) |
|
PDF (Daftar Pustaka)
Daftar Pustaka.pdf Download (171kB) |
|
PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf Restricted to Repository staff only Download (332kB) |
Abstract
PT. Sumi Asih is a manufacturing company engaged in the oleochemical industry. The raw materials used consist of RBD Stearin and RBD Palm Oil. The problem that occurs is that there is no safety stock of raw materials so that it is out of stock. The aim of this research is to analyze the use of the EOQ and POQ methods in the effectiveness of raw material inventory management and compare the EOQ and POQ methods with existing methods that have been implemented. Based on the results of RBD Stearin calculations using the EOQ method, the order quantity was 3,641,013 kg with an order frequency of 10 times a year and a total inventory cost of Rp. 80,851,698. Meanwhile, for RBD Stearin using the POQ method, the order quantity is 1,395,637 kg with an order frequency of 26 times a year and a total inventory cost of Rp. 71,481,834. For RBD Stearin using the EOQ method, the order quantity was 1,546,225 kg with an order frequency of 10 times a year and a total inventory cost of Rp. 78,804,488. Meanwhile, for RBD Palm Oil using the POQ method, the order quantity is 271,824 with an order frequency of 59 times a year and a total inventory cost of Rp. 65,889,255. So the method that can be proposed is the POQ method because POQ storage costs are lower than EOQ storage costs.
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | Pengendalian Persediaan, EOQ, POQ, Biaya Persediaan |
Subjects: | T Technology > T Technology (General) T Technology > TI Industrial Engineering |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Unnamed user with username d600200261 |
Date Deposited: | 15 Jul 2024 03:43 |
Last Modified: | 15 Jul 2024 03:43 |
URI: | http://eprints.ums.ac.id/id/eprint/125041 |
Actions (login required)
View Item |