Darmawan, Yusuf Masykur and , Dr. Indah Pratiwi, S.T., M.T (2023) Implementasi Lean Manufacturing Untuk Meminimalisir Waste Pada Proses Produksi Ring Api Dengan Metode Value Stream Mapping Dan Waste Assessment Model (Studi Kasus: Umkm Pengecoran Logam Enggal Jaya). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN PUBLIKASI.pdf Restricted to Repository staff only Download (464kB) |
|
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (492kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (745kB) |
|
PDF (Bab I)
BAB I.pdf Download (46kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (301kB) |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (156kB) |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (810kB) |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (30kB) |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (94kB) |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) |
Abstract
UMKM Enggal Jaya is an industry engaged in metal casting. This UMKM produces Ring Api with a production capacity of more than 15,000 products every month. During the production process of Ring Api, several wastes were found. Based on the seven waste categories, Enggal Jaya SMEs tend to have problems with the seven wastes, including overproduction, defects, inventory, motion, transportation, process, waiting. The purpose of this research is to design information flow maps and production maps for making ring of fire components, analyze what types of waste and identify the causes of waste and minimize waste on the Enggal Jaya UMKM production floor, and provide suggestions for improvements to reduce waste that occurs in Enggal UMKM. Jaya. The method used is Value Stream Mapping and Waste Assessment Model. Based on the results of CVSM processing, a Process Cycle Efficiency (PCE) of 69% was obtained, while the FVSM obtained a PCE of 73%. In the WRM calculation, waste form overproduction has the greatest value, namely 19%, while waste to inventory has the greatest value, with a value of 18%. Based on the results of the waste calculation using WAQ, it was found that the 5 most dominant types of waste that occurred in UMKM Enggal Jaya, namely waste overproduction 19.2%, waste defect 18%, waste inventory 16.1%, waste motion 15.2%, and waste transportation 13 .3%. Proposed improvements include recording every activity, making Standard Operational procedur (SOP) of production, adding material handling, and forecasting and scheduling the production process.
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | Pemborosan, Lean Manufacturing, VSM, WAM |
Subjects: | T Technology > TI Industrial Engineering T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | YUSUF MASYKUR DARMAWAN |
Date Deposited: | 09 Aug 2023 07:54 |
Last Modified: | 09 Aug 2023 07:54 |
URI: | http://eprints.ums.ac.id/id/eprint/114631 |
Actions (login required)
View Item |