Analisa Penjadwalan Proses Produksi Pada Workcenter Perakitan Rangka Samping Bus Menggunakan Metode Backward Scheduling Basis PERT

Kusumaningrum, Regita Cahyani and , Much Djunaidi, S.T., M.T. (2023) Analisa Penjadwalan Proses Produksi Pada Workcenter Perakitan Rangka Samping Bus Menggunakan Metode Backward Scheduling Basis PERT. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (823kB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (1MB)
[img] PDF (Bab I)
BAB I.pdf

Download (138kB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (502kB)
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (42kB)
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (316kB)
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (17kB)
[img] PDF (Surat Pernyataan Publikasi)
D600190221_Surat Pernyataan.pdf
Restricted to Repository staff only

Download (192kB)
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (114kB)

Abstract

CV Laksana is a company that produces various types of body buses by modifying the bus chassis. The company uses production system is make to order with forward scheduling. The dense demand for products after the pandemic has the potential to become a bottleneck in the side frame assembly process, which is increasing demand and production targets with man power, including production processes that do not comply with company standards time. Production scheduling in this study used the backward scheduling based on PERT. This study aims to analyze the expected production time and standard time and scheduling methods that are effective, efficient, and can reduce lead time and reduce bottlenecks. Based on data and analysis, the expected production time in the PERT analysis for Tourista type is 162 minutes and SR 3 Suites Class is 587 minutes with an effective and efficient production process standard time of 227 minutes and 835 minutes. Method backwards scheduling parameter Effective Index produces a value (EI)>1 meaning that it has better performance compared to the company's method with a percentage of time saving for the Tourista type of 45,06% and 0.8% for the SR 3 Suites Class type based of Relative Error (RE).

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Backward scheduling, PERT, Side frame assembly, and Standard time.
Subjects: T Technology > TI Industrial Engineering
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: REGITA CAHYANI KUSUMANINGRUM
Date Deposited: 15 Feb 2023 07:54
Last Modified: 15 Feb 2023 07:54
URI: http://eprints.ums.ac.id/id/eprint/108463