Anngraita Nurchalis, Tampan and , Mochamad Solikin, Ph.D. (2021) Evaluasi Pelaksanaan Proyek Pembangunan Gedung Baru Kecamatan Matesih Kabupaten Karanganyar dengan Metode CPM (Studi Kasus: Pelaksanaan Proyek Pembangunan Gedung Baru Kecamatan Matesih Kabupaten Karanganyar dengan Metode Cpm). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (904kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (801kB) |
|
PDF (Bab I)
BAB I.pdf Download (229kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (165kB) |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (330kB) |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (167kB) |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (Bab VI)
BAB VI.pdf Restricted to Repository staff only Download (135kB) |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (170kB) |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN.pdf Restricted to Repository staff only Download (196kB) |
Abstract
Scheduling a project helps show the relationship between each activity and other activities and to the overall project work, CPM (Critical Path Method) assumes that the activity time is known with certainty so that only one time factor is required for each activity. This study aims to apply the CPM method in rescheduling a new building construction project in Matesih District with the CPM method. The first week to the 9th week the project has fluctuating progress while in the 10th week the project is less stable and experiences the most delays, namely -2.227%, the 11th week the project exceeds the target and the project can run according to the S Curve (time schedule). From the results of making an alternative acceleration, an alternative is obtained, namely overtime work is carried out for 7 days, the acceleration alternative is an alternative to overtime work for 7 days at the initial cost IDR 3,247,361,000 and after overtime for 7 days IDR 3,273,030,263 with overtime fee of Rp 25,668,838.00- which is compared to the cost of the fine ie IDR 3,263,273,064 with a fine for 7 days IDR 2,273,152.00-. It is better not to do overtime work because the cost of overtime and overtime costs is greater than the cost of the fine. Keywords : cpm methods, scheduling, construction projects
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Keywords : cpm methods, scheduling, construction projects |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | TAMPAN ANGGRAITA NURCHALIS |
Date Deposited: | 19 Feb 2021 08:21 |
Last Modified: | 19 Feb 2021 08:21 |
URI: | http://eprints.ums.ac.id/id/eprint/89715 |
Actions (login required)
View Item |