Perbandingan Biaya dan Waktu pada Pelaksanaan Pekerjaan Konstruksi Antara Beton Konvensional dan Flyslab (Studi Proyek Pembangunan Gedung RS. Islam Boyolali)

Arian, Rizka Dwi and , Ir. Aliem Sudjatmiko, M. T. (2020) Perbandingan Biaya dan Waktu pada Pelaksanaan Pekerjaan Konstruksi Antara Beton Konvensional dan Flyslab (Studi Proyek Pembangunan Gedung RS. Islam Boyolali). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (279kB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (803kB)
[img] PDF (Bab I)
BAB I.pdf

Download (12kB)
[img] PDF (Bab II)
BAB II RIZKA.pdf
Restricted to Repository staff only

Download (188kB) | Request a copy
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (180kB) | Request a copy
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (96kB) | Request a copy
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (100kB) | Request a copy
[img] PDF (Bab VI)
BAB VI.pdf
Restricted to Repository staff only

Download (102kB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (8kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (4MB) | Request a copy
[img] PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf
Restricted to Repository staff only

Download (149kB) | Request a copy

Abstract

The construction implementation method has an impact not only on the processing time but on the implementation costs that must be incurred. The cost calculation is done by calculating the material cost and the work unit cost. Meanwhile, the calculation of time is by calculating the work plan time. This study aims to analyze the cost and time required to complete a multi-storey building construction work, particularly floor slabs using fly slab concrete compared to conventional reinforced concrete. The methodology used is to recalculate the cost and time of the Boyolali Islamic Hospital building, which was originally built using conventional reinforced concrete into fly slab concrete. Based on the comparative analysis of the construction implementation costs using conventional concrete and flyslab concrete, the construction of the Boyolali Islamic Hospital building as a whole using flyslab concrete can reduce costs by Rp. 269,023,055.00 from the value of floor slab work using conventional concrete. While the comparison of the implementation time, the time period for completing the construction work of the Boyolali Islamic Hospital building using flyslab concrete is 55 calendar days. The time saving between using conventional concrete and flyslab concrete is 10 calendar days.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: conventional concrete, flyslab, time, cost.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: RIZKA DWI ARIAN
Date Deposited: 23 Nov 2020 02:21
Last Modified: 23 Nov 2020 02:21
URI: http://eprints.ums.ac.id/id/eprint/87806

Actions (login required)

View Item View Item