Arian, Rizka Dwi and , Ir. Aliem Sudjatmiko, M. T. (2020) Perbandingan Biaya dan Waktu pada Pelaksanaan Pekerjaan Konstruksi Antara Beton Konvensional dan Flyslab (Studi Proyek Pembangunan Gedung RS. Islam Boyolali). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (279kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (803kB) |
|
PDF (Bab I)
BAB I.pdf Download (12kB) |
|
PDF (Bab II)
BAB II RIZKA.pdf Restricted to Repository staff only Download (188kB) | Request a copy |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (180kB) | Request a copy |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (96kB) | Request a copy |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (100kB) | Request a copy |
|
PDF (Bab VI)
BAB VI.pdf Restricted to Repository staff only Download (102kB) | Request a copy |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (8kB) |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (4MB) | Request a copy |
|
PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf Restricted to Repository staff only Download (149kB) | Request a copy |
Abstract
The construction implementation method has an impact not only on the processing time but on the implementation costs that must be incurred. The cost calculation is done by calculating the material cost and the work unit cost. Meanwhile, the calculation of time is by calculating the work plan time. This study aims to analyze the cost and time required to complete a multi-storey building construction work, particularly floor slabs using fly slab concrete compared to conventional reinforced concrete. The methodology used is to recalculate the cost and time of the Boyolali Islamic Hospital building, which was originally built using conventional reinforced concrete into fly slab concrete. Based on the comparative analysis of the construction implementation costs using conventional concrete and flyslab concrete, the construction of the Boyolali Islamic Hospital building as a whole using flyslab concrete can reduce costs by Rp. 269,023,055.00 from the value of floor slab work using conventional concrete. While the comparison of the implementation time, the time period for completing the construction work of the Boyolali Islamic Hospital building using flyslab concrete is 55 calendar days. The time saving between using conventional concrete and flyslab concrete is 10 calendar days.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | conventional concrete, flyslab, time, cost. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | RIZKA DWI ARIAN |
Date Deposited: | 23 Nov 2020 02:21 |
Last Modified: | 23 Nov 2020 02:21 |
URI: | http://eprints.ums.ac.id/id/eprint/87806 |