Nugroho, Aditya Ady and -, Ir. Jatmiko, M.T. (2020) Analisis Pengaruh Penambahan Penyulang MSR 13 untuk Mengatasi Jatuh Tegangan dan Rugi Daya pada Penyulang SRN 03. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (1MB) |
|
PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN PUBLIKASI ILMIAH.pdf Restricted to Repository staff only Download (3MB) | Request a copy |
Abstract
The need for electricity is getting longer. Development of energy requirements in a 20kV feeder. Increased cost growth in the 20kV feeder. The problem that often occurs is that the feeder load current will supply more than the standard current of the SPLN, which is half of 480A. Currents that exceed this standard are one of the factors that reduce voltage because the voltage on the network decreases and also the power is reduced, while the power sent to the distribution network does not all reach the customer. The SRN 03 feeder has a measured current value in one of its 285A phases with a network length of 22,08 km. The addition of a new feeder MSR 13 is done to break down the burden of SRN 03. Analysis of the maturity and power loss in the network is done using manual calculations and simulation of ETAP 12.6.0 software. The manual calculation obtained on the SRN 03 feeder is the value of the receiving voltage due to a voltage drop of 18.49 kV and a power loss of 328.42 kW, after breaking the load by the MSR feeder 13 the value of the receiving voltage due to a voltage drop is 19.447 kV and the usability is 68.282 kW . The results of ETAP 12.6.0 simulation on SRN 03 feeders are the value of the receiving voltage due to a voltage drop of 18.39 kV and a power loss of 344 kW, after breaking the load by the MSR feeder 13 the value of the receiving voltage decreases the risk to 19,439 kV and the power value becomes 66,8 kW.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | arus, ETAP 12.6.0, jatuh tegangan, penyulang, rugi daya |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Fakultas Teknik > Teknik Elektro |
Depositing User: | ADITYA ADY NUGROHO |
Date Deposited: | 31 Jan 2020 03:46 |
Last Modified: | 31 Jan 2020 03:46 |
URI: | http://eprints.ums.ac.id/id/eprint/80126 |
Actions (login required)
View Item |