Suseno, Elfan and , Hasyim Asy'ari, ST., MT (2018) Desain Instalasi Elektrikal, Mekanikal dan Plumbing Rumah Sakit Umum Daerah Gambiran II Kediri. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Rev.11 Naskah Publikasi RSUD Gambiran II Kediri.pdf Download (7MB) |
|
PDF (Pernyataan Publikasi Ilmiah)
Surat Pernyataan Publikasi Ilmiah.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
Abstract
RSUD GAMBIRAN II KEDIRI’s building is the building that serves as a public service in the areas of health, where the building must have the supporting facilities of the complex. In order to meet the needs of the public health service facilities this building cannot be separated from the electric needs mainly installations for lighting, room temperature control (Air Conditioner), water pumps for clean water and also needs protection system the building in case of fire, as supporting security for users of the building. To meet those needs then needed a calculation and design of the electrical installation of reliable economical. With the installation of the electrical installation which will give rise to a sense of security and comfort for users of the building. Installation planning on RSUD GAMBIRAN II KEDIRI’s buildingthis using some program DIALux light simulation program for Microsoft Excel to calculate the number of point lights and current load, Auto CAD program to draw a single line diagram the installation of mechanical, electrical, and plumbing. Referring to the planned calculation indicates the total power required of 807375.39 VA/807,376 kVA. From the calculation can determine the magnitude of quantity and safety of carriage. Based on the calculation of the building using the main seat MCCB (Molded Case Circuit Breaker) 3 phase with the main conductor and 1250A rating NYFGbY 4 x 300 mm2. To meet the needs of clean water and water fire extinguisher require a backup water of 546.94 m³ tank ground size 11m x 10 m x 5 m.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Auto CAD, Instalasi MEP, Penghantar Utama, Hydrant, Safety System |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Fakultas Teknik > Teknik Elektro |
Depositing User: | Elfan Suseno |
Date Deposited: | 05 Nov 2019 04:38 |
Last Modified: | 05 Nov 2019 04:38 |
URI: | http://eprints.ums.ac.id/id/eprint/78244 |
Actions (login required)
View Item |