Putra, Adittya Wahyu Kurnia and , Darsono., S.H., M.H (2019) Perjanjian Pemborongan Studi Tentang Kontrak Kerja Konstruksi Pembangunan Pondasi Pabrik PT Indocali Plast di Karanganyar. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Naskah Publikasi.pdf Download (350kB) |
|
PDF (Halaman Depan)
HALAMAN DEPAN.pdf Download (622kB) |
|
PDF (Bab I)
BAB I.pdf Download (286kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (214kB) | Request a copy |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (240kB) | Request a copy |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (96kB) | Request a copy |
|
PDF (Daftar Pustaka)
Daftar Pusaka.pdf Download (193kB) |
|
PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf Restricted to Repository staff only Download (237kB) | Request a copy |
Abstract
The purpose of this research is to find out how the implementation of the construction work of the factory foundation construction work between PT Indocali Plast and CV Gendeng Mas and to find out the legal responsibilities of the service providers for mistakes that have been made in the implementation of construction work contracts between PT Indocali Plast and CV Gendeng Mas and to find out ways to resolve disputes in construction work contracts between PT Indocali Plast and CV Gendeng Mas. This research is a descriptive study and uses an empirical juridical approach. The results of this study are the process of carrying out the construction of a factory foundation construction contract between PT Indocali Plast and CV Gendeng Mas through several stages, namely the tender stage, the stage of contracting (work contract) and the signing of the contract of contract (work contract), the three stages of the implementation of the work contract construction of PT Indocali Plast plant foundation construction. In the construction work contract between PT Indocali Plast and CV Gendeng Mas there are rights and obligations of the parties. For the legal responsibility of the service provider in the construction work contract in the form of the responsibility of the service provider in completing the work beyond the time period and the responsibility of the service provider to do the work not in accordance with the bestek. The method for resolving disputes in construction work contracts between PT Indocali Plast and CV Gendeng Mas, namely through deliberation to reach consensus.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Construction, Employment Contract, Chartering Agreement |
Subjects: | K Law > K Law (General) |
Divisions: | Fakultas Hukum > Hukum |
Depositing User: | ADITTYA WAHYU KURNIA PUTRA |
Date Deposited: | 16 Aug 2019 08:47 |
Last Modified: | 16 Aug 2019 08:47 |
URI: | http://eprints.ums.ac.id/id/eprint/76295 |
Actions (login required)
View Item |