Penerapan Total Productive Maintenance (TPM) dan Six Big Losses untuk Meningkatkan Efektivitas dan Efisiensi pada Mesin Injection Molding Nigata (Studi Kasus: Asia Protendo Graha)

Utomo, Galang Adityo and , Ahmad Kholid Al Ghofari, ST. MT. (2018) Penerapan Total Productive Maintenance (TPM) dan Six Big Losses untuk Meningkatkan Efektivitas dan Efisiensi pada Mesin Injection Molding Nigata (Studi Kasus: Asia Protendo Graha). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI-67.pdf

Download (1MB)
[img] PDF (Halaman Depan)
Halaman Depan.pdf

Download (1MB)
[img] PDF (Bab I)
Bab I.pdf

Download (299kB)
[img] PDF (Bab II)
Bab II.pdf
Restricted to Repository staff only

Download (588kB) | Request a copy
[img] PDF (Bab III)
Bab III.pdf
Restricted to Repository staff only

Download (205kB) | Request a copy
[img] PDF (Bab IV)
Bab IV.pdf
Restricted to Repository staff only

Download (747kB) | Request a copy
[img] PDF (Bab V)
Bab V.pdf
Restricted to Repository staff only

Download (185kB) | Request a copy
[img] PDF (Daftar Pustaka)
Daftar Pustaka.pdf

Download (294kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN PUBLIKASI ILMIAH.pdf
Restricted to Repository staff only

Download (388kB) | Request a copy

Abstract

Asia Protendo Graha is a private company engaged in the industry of cutting sealing, mold and die, and injection molding. The problem found in the company is the low level of effectiveness of the injection molding machine, where the machine is often damaged because the machine works continuously due to consumer demand which is increasingly increasing. To overcome this, the calculation of the Overall Equipment Effectiveness value is obtained from the calculation of the value of availability rate, performance rate and quality rate. Based on the results of the study, it can be seen that the value of each faktor in sequence is 87.41%, 64.58%, 98.96%. So that it can be seen that the OEE value is 56%. Then to ensure the performance rate faktor is a faktor that causes the OEE value to be low, then an analysis of the six big losses is carried out, it is proven that the performance rate value that causes the OEE value to be low. After that, an analysis is performed using a causal diagram to provide a proposed improvement which will later be used as a reference to make a simulation of the Total Productive Maintenance (TPM) application. With the proposed improvements made, it can be simulated the application of TPM, which is able to increase the OEE value by 56% to 77%. It is expected that with the proposed improvements, the TPM design can be applied to the company, so that it can increase the effectiveness of the injection molding machine.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: OEE, Injection Molding, Six Big Losses, TPM
Subjects: Q Science > Q Science (General)
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: GALANG ADITYO UTOMO
Date Deposited: 05 Nov 2018 03:11
Last Modified: 22 Nov 2019 01:30
URI: http://eprints.ums.ac.id/id/eprint/68152

Actions (login required)

View Item View Item