Proses Penyelesaian Perkara Perbuatan Melawan Hukum Atas Pelaksanaan Pembangunan Gedung Antara PT. Mumpuni dan Pemborong yang Diambil Alih Secara Sepihak (Studi Kasus di Pengadilan Negeri Sukoharjo)

Rakasiwi, Arga Fredy and , Nuswardhani, S.H.,S.U (2018) Proses Penyelesaian Perkara Perbuatan Melawan Hukum Atas Pelaksanaan Pembangunan Gedung Antara PT. Mumpuni dan Pemborong yang Diambil Alih Secara Sepihak (Studi Kasus di Pengadilan Negeri Sukoharjo). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (NASKAH PUBLIKASI)
NASKAH PUBLIKASI.pdf

Download (561kB)
[img] PDF (HALAMAN DEPAN)
HALAMAN DEPAN.pdf

Download (925kB)
[img] PDF (BAB I)
BAB I.pdf

Download (177kB)
[img] PDF (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (311kB) | Request a copy
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (283kB) | Request a copy
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (32kB) | Request a copy
[img] PDF (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (86kB)
[img] PDF (PERNYATAAN PUBLIKASI ILMIAH)
SURAT PERNYATAAN PUBLIKASI KARYA ILMIAH.pdf
Restricted to Repository staff only

Download (232kB) | Request a copy

Abstract

In the case of unlawful acts on the implementation of building construction between PT. Mumpuni and the unilaterally acquired contractor, the contractor undertakes a construction agreement of 3 billion with PT. Mumpuni in the construction of Inpatient Health Building RSUD Sukoharjo RSUD Sukoharjo. After they have entered into a cooperation agreement, PT. Mumpuni take the takeover of building construction project unilaterally and resulted in generator menggalami losses with a total loss of 410.615.125 million rupiah. The contractor then filed a lawsuit to the Sukoharjo District Court and asked the judge to state that PT. Mumpuni has committed an act against the law. This study aims to explain the judges' considerations in determining the verification, determining decision, and legal consequences in case of unlawful acts on the implementation of building construction between PT. Mumpuni and unilaterally taken over. The method used in this research is juridical approach method with descriptive research type. The conclusion of this research is in determining the verification, the judge considering the plaintiff's lawsuit, the defendant's answer and the evidence presented in the hearing. in determining the verdict, the judge considers whether or not the elements of unlawful acts are included in Article 1365 of the Civil Code. The legal consequences after the existence of the judge's decision in the case of unlawful acts on the implementation of building construction between PT. A qualified person and contractor who is unilaterally taken to the defendant I is obliged voluntarily to carry out all decisions of the hakin handed down to him and if he does not enforce the judgment, the Plaintiff may request to the District Court to execute in order to carry out a judgment with a permanent legal action.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: Settlement process, unlawful action, and takeover of building construction project unilaterally
Subjects: K Law > K Law (General)
Divisions: Fakultas Hukum > Hukum
Depositing User: ARGA FREDY RAKASIWI
Date Deposited: 04 Aug 2018 05:07
Last Modified: 04 Aug 2018 05:07
URI: http://eprints.ums.ac.id/id/eprint/65115

Actions (login required)

View Item View Item