Nurmajid, Wahyu and -, Ir. Muchlison Anis, ST, MT and -, Ida Nursanti, ST, M.Eng.Sc (2018) PENDEKATAN METODE LEAN SIX SIGMA UNTUK MENGANALISIS WASTE PADA PERUSAHAAN HANDUK CV. NGREMBOKO JANTI NGENDO KLATEN. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (NASKAH PUBLIKASI)
NASKAH PUBLIKASI.pdf Download (335kB) |
|
PDF (HALAMAN DEPAN)
HALAMAN DEPAN.pdf Download (1MB) |
|
PDF (BAB I)
BAB I.pdf Download (279kB) |
|
PDF (BAB II)
BAB II.pdf Restricted to Repository staff only Download (637kB) | Request a copy |
|
PDF (BAB III)
BAB III.pdf Restricted to Repository staff only Download (284kB) | Request a copy |
|
PDF (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (BAB V)
BAB V.pdf Restricted to Repository staff only Download (276kB) | Request a copy |
|
PDF (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (361kB) |
|
PDF (LAMPIRAN)
LAMPIRAN.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
|
PDF (PERNYATAAN PUBLIKASI ILMIAH)
SURAT PERNYATAAN PUBLIKASI.pdf Restricted to Repository staff only Download (573kB) | Request a copy |
Abstract
To the process of production, it was not uncommon products that towel produced having the quality of being not as expected and became a waste activities. Research aims to identify problems with the quality and get the repair proposal reach failure zero (zero defect) By using lean six sigma analysis DMAIC (Define, Measure, Analyze, Improved, Control). The results of the study, in phase define the results of the questionnaire waste workshop. Then the total phase measure shows that the level of sigma a towel CV.Ngremboko 3,461835 σas much as.This figure does not having the capacity of the process by which good so they should is continuously repaired. The next stage of the point of view of a diagram pareto analyze phase in a can defect highest overall performance is a towel dirty at 19,72% and thread not 15,60% are woven as much as. As for the results of the analysis using Fishbone Diagram used looking for the factors causing the defect and an analysis of why the 5 or root cause of each the human factor, a method of, the environment and the engine has done next cause of the proposed fixes at phase improved to reduce problems that emerged with the methods 5R. And the final phase of the namely phase control carried out as an effort to standardization which was expanded using procedure used as standard work guidelines so that phase control becomes an activity enjoyed both cultural practices systematic who work in its implementation in lean or on a continual.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Handuk, Pengendalian Kualitas, Lean Six Sigma, DMAIC, Waste |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | WAHYU NURMAJID |
Date Deposited: | 26 Jul 2018 04:57 |
Last Modified: | 26 Jul 2018 04:57 |
URI: | http://eprints.ums.ac.id/id/eprint/64064 |
Actions (login required)
View Item |