PENDEKATAN METODE LEAN SIX SIGMA UNTUK MENGANALISIS WASTE PADA PERUSAHAAN HANDUK CV. NGREMBOKO JANTI NGENDO KLATEN

Nurmajid, Wahyu and -, Ir. Muchlison Anis, ST, MT and -, Ida Nursanti, ST, M.Eng.Sc (2018) PENDEKATAN METODE LEAN SIX SIGMA UNTUK MENGANALISIS WASTE PADA PERUSAHAAN HANDUK CV. NGREMBOKO JANTI NGENDO KLATEN. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (NASKAH PUBLIKASI)
NASKAH PUBLIKASI.pdf

Download (335kB)
[img] PDF (HALAMAN DEPAN)
HALAMAN DEPAN.pdf

Download (1MB)
[img] PDF (BAB I)
BAB I.pdf

Download (279kB)
[img] PDF (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (637kB) | Request a copy
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (284kB) | Request a copy
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (276kB) | Request a copy
[img] PDF (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (361kB)
[img] PDF (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy
[img] PDF (PERNYATAAN PUBLIKASI ILMIAH)
SURAT PERNYATAAN PUBLIKASI.pdf
Restricted to Repository staff only

Download (573kB) | Request a copy

Abstract

To the process of production, it was not uncommon products that towel produced having the quality of being not as expected and became a waste activities. Research aims to identify problems with the quality and get the repair proposal reach failure zero (zero defect) By using lean six sigma analysis DMAIC (Define, Measure, Analyze, Improved, Control). The results of the study, in phase define the results of the questionnaire waste workshop. Then the total phase measure shows that the level of sigma a towel CV.Ngremboko 3,461835 σas much as.This figure does not having the capacity of the process by which good so they should is continuously repaired. The next stage of the point of view of a diagram pareto analyze phase in a can defect highest overall performance is a towel dirty at 19,72% and thread not 15,60% are woven as much as. As for the results of the analysis using Fishbone Diagram used looking for the factors causing the defect and an analysis of why the 5 or root cause of each the human factor, a method of, the environment and the engine has done next cause of the proposed fixes at phase improved to reduce problems that emerged with the methods 5R. And the final phase of the namely phase control carried out as an effort to standardization which was expanded using procedure used as standard work guidelines so that phase control becomes an activity enjoyed both cultural practices systematic who work in its implementation in lean or on a continual.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: Handuk, Pengendalian Kualitas, Lean Six Sigma, DMAIC, Waste
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: WAHYU NURMAJID
Date Deposited: 26 Jul 2018 04:57
Last Modified: 26 Jul 2018 04:57
URI: http://eprints.ums.ac.id/id/eprint/64064

Actions (login required)

View Item View Item