Analisis Rugi-Rugi Daya Pada Saluran Transmisi Tegangan Tinggi 150 kV Dari Gardu Induk Wonogiri Sampai Gardu Induk Wonosari

Dewantara, Mahardira and , Umar, S.T., M.T. (2018) Analisis Rugi-Rugi Daya Pada Saluran Transmisi Tegangan Tinggi 150 kV Dari Gardu Induk Wonogiri Sampai Gardu Induk Wonosari. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI (Bismillah).pdf

Download (1MB)
[img] PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN PUBLIKASI ILMIAH.pdf
Restricted to Repository staff only

Download (485kB) | Request a copy

Abstract

The growth of the population that has a modern life such as today leads to an increase in electrical energy needs. PLN (Perusahaan Listrik Negara) is the provider that provides electrical energy. Providers that provide electrical energy, have levels in the distribution of electric power, among others, power plants, the level of electrical transmission and the level of electricity distribution. When the process of distributing electricity to the consumer has various problems including power losses in the transmission line. Transmission lines caused by power losses need to be taken into account, as they may cause power loss during power supply discharges. This analysis is conducted to find out the power losses in high voltage line 150 kV from Wonogiri substation to Wonosari main substation. The research method used by collecting data. Data collection is done every day at 10.00 GMT +7 and 19.00 GMT+7 continuously for one month by recording the voltage and current. This transmission line uses a TACSR 410 mm2. The results of this study, obtained the highest power losses on October 24 during the day at 0.181516 MW and night power losses of 0.263164 MW. On average per day the highest power losses occur on 24 October with losses of 0.22234 MW. The lowest power losses on 16, 17, 18, 19 and 20 October with losses of 0.051106 MW and night-time losses occurred on 17 October with losses of 0.049812 MW. The average day-to-day low-loss power loss occurs on October 21 with 0.025553 MW losses. Loss of Energy during October 2017 amounted to 68.887836 MWh with material loss incurred by PT. PLN (Persero) amounting to Rp 78,877,949.86.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: Analysis, Power Loss, Transmission
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: MAHARDIRA DEWANTARA
Date Deposited: 12 Feb 2018 06:29
Last Modified: 12 Feb 2018 06:29
URI: http://eprints.ums.ac.id/id/eprint/60172