Evaluasi Rencana Anggaran Biaya Perencanaan Gedung Kuliah 5 Lantai Dengan Sistem Rangka Pemikul Momen Menengah Di Wilayah Surakarta

Hariyono, and , Yenny Nurchasanah, S.T., M.T. (2017) Evaluasi Rencana Anggaran Biaya Perencanaan Gedung Kuliah 5 Lantai Dengan Sistem Rangka Pemikul Momen Menengah Di Wilayah Surakarta. Diploma thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
publication.pdf

Download (2MB)
[img] PDF (Lampiran)
LAMPIRAN .pdf
Restricted to Repository staff only

Download (5MB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN.pdf
Restricted to Repository staff only

Download (639kB) | Request a copy

Abstract

Cost budgeting plan (RAB) has a very important function in the world of construction, not only for professionals but for everyone who wants to be involved in the construction world itself like owner or investor.namun way budget cost calculation is not easy and takes time not short. This evaluation aims to find to calculate cost budget plan In the design of the building structure calculated by the method of unit price analysis in the building with Medium Moment Resisting Frame System (SRPMM) Surakarta region, the result of the calculation of the difference between the cost of floors obtained the result known budget the smallest cost rooftop of Rp 1,225,093,603,01, - and the largest budget is the 4th and 5th floors of Rp 2,119,636,090,56, - ​​and the total budget for the construction of a 5-floor college building with a medium-skidding system for the Surakarta region of Rp 13,772 .581.000,00, -

Item Type: Karya ilmiah (Diploma)
Uncontrolled Keywords: Angaran biaya, Perencanaan, rab
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: HARIYONO
Date Deposited: 08 Jan 2018 03:05
Last Modified: 08 Jan 2018 03:05
URI: http://eprints.ums.ac.id/id/eprint/57978

Actions (login required)

View Item View Item