Pendekatan Lean Manufacturing Pada Sistem Produksi Kursi untuk Meminimasi Waste (Studi Kasus : CV Tiga Berlian Jaya)

Hanifaningtyas, Chaerani Nusarizka and , Mila Faila Sufa ST.,MT. (2017) Pendekatan Lean Manufacturing Pada Sistem Produksi Kursi untuk Meminimasi Waste (Studi Kasus : CV Tiga Berlian Jaya). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (1MB)
[img] PDF (Halaman Depan)
Halaman Depan.pdf

Download (886kB)
[img] PDF (Bab I)
BAB I.pdf

Download (99kB)
[img] PDF (Bab II)
BAB-II.pdf
Restricted to Repository staff only

Download (795kB) | Request a copy
[img] PDF (Bab III)
BAB-III.pdf
Restricted to Repository staff only

Download (103kB) | Request a copy
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (871kB) | Request a copy
[img] PDF (Bab V)
BAB-V.pdf
Restricted to Repository staff only

Download (87kB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (350kB)
[img] PDF (Lampiran)
Lampiran.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
Surat Pernyataan Naskah Publikasi.pdf
Restricted to Repository staff only

Download (587kB) | Request a copy

Abstract

CV. Tiga Berlian Jaya is a business engaged in manufacturing furniture making furniture. The rapid industrial development also requires companies to maintain consumer confidence by producing quality products and on time delivery. However, this company in the fulfillment of production is still found delay due to waste that occurred in the work area. Therefore, this research is useful to decrease the existing waste on the production floor so that it can minimize with the recommendation of improvement so that the production process can be completed according to the target set. Value Stream Mapping Approach is one of Lean approach which has diagram arrangement (map) that can identify the time needed in a product workmanship, waiting time of each process step, and describes waiting time of next process is waste. The result of activity mapping obtained 283 minutes of production lead time. With Value Added activity amounted to 14, Non Value Added activity as much as 6 and Non Necessary Value Added activity as much as 4. Based on the recommendation recommendation made and mapped back the previous lead time can be reduced to 255.5 minutes or 5.4%. As well as the operating time can be reduced by 25 minutes and transport time is reduced by 24 minutes

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: Lean Manufacturing, Value Stream Mapping, Waste
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: CHAERANI NUSARIZKA H
Date Deposited: 01 Nov 2017 03:07
Last Modified: 01 Nov 2017 03:07
URI: http://eprints.ums.ac.id/id/eprint/56662

Actions (login required)

View Item View Item