Hanifaningtyas, Chaerani Nusarizka and , Mila Faila Sufa ST.,MT. (2017) Pendekatan Lean Manufacturing Pada Sistem Produksi Kursi untuk Meminimasi Waste (Studi Kasus : CV Tiga Berlian Jaya). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf Download (1MB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (886kB) |
|
PDF (Bab I)
BAB I.pdf Download (99kB) |
|
PDF (Bab II)
BAB-II.pdf Restricted to Repository staff only Download (795kB) | Request a copy |
|
PDF (Bab III)
BAB-III.pdf Restricted to Repository staff only Download (103kB) | Request a copy |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (871kB) | Request a copy |
|
PDF (Bab V)
BAB-V.pdf Restricted to Repository staff only Download (87kB) | Request a copy |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (350kB) |
|
PDF (Lampiran)
Lampiran.pdf Restricted to Repository staff only Download (3MB) | Request a copy |
|
PDF (Pernyataan Publikasi Ilmiah)
Surat Pernyataan Naskah Publikasi.pdf Restricted to Repository staff only Download (587kB) | Request a copy |
Abstract
CV. Tiga Berlian Jaya is a business engaged in manufacturing furniture making furniture. The rapid industrial development also requires companies to maintain consumer confidence by producing quality products and on time delivery. However, this company in the fulfillment of production is still found delay due to waste that occurred in the work area. Therefore, this research is useful to decrease the existing waste on the production floor so that it can minimize with the recommendation of improvement so that the production process can be completed according to the target set. Value Stream Mapping Approach is one of Lean approach which has diagram arrangement (map) that can identify the time needed in a product workmanship, waiting time of each process step, and describes waiting time of next process is waste. The result of activity mapping obtained 283 minutes of production lead time. With Value Added activity amounted to 14, Non Value Added activity as much as 6 and Non Necessary Value Added activity as much as 4. Based on the recommendation recommendation made and mapped back the previous lead time can be reduced to 255.5 minutes or 5.4%. As well as the operating time can be reduced by 25 minutes and transport time is reduced by 24 minutes
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Lean Manufacturing, Value Stream Mapping, Waste |
Subjects: | T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | CHAERANI NUSARIZKA H |
Date Deposited: | 01 Nov 2017 03:07 |
Last Modified: | 01 Nov 2017 03:07 |
URI: | http://eprints.ums.ac.id/id/eprint/56662 |
Actions (login required)
View Item |