Designing A Mechanical Electrical And Plumbing (Mep) Installation Of Hotel Acacia Jajar

Puryanto, Ika and , Agus Supardi, S.T., M.T (2017) Designing A Mechanical Electrical And Plumbing (Mep) Installation Of Hotel Acacia Jajar. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
Naskah Publikasi.pdf

Download (830kB)
[img] PDF (Pernyataan Publikasi Ilmiah)
surat pernyataan.pdf
Restricted to Repository staff only

Download (615kB) | Request a copy

Abstract

Hotel Acacia Jajar is one type of accommodation engaged in lodging services, food and beverage providers and other services for the public who are managed commercially. The hotel operates 24 hours a day, without a holiday to serve the general public who want to use hotel services. Dense activity in the hotel resulted in the need for high electrical energy, so the need for a mature planning in the construction of a hotel in order to produce a proper hotel and energy saving. Energy saving is important because the current global energy management paradigm puts energy saving as the first energy source. In this case the researcher doing the installation of Acacia Jajar Hotel building which put forward the reliability and efficiency of electric energy. To be able to produce a reliable electrical installation and energy efficient need careful planning, ranging from the selection of energy-efficient power tools until the right calculation. One example is the use of LED lights for lighting that has an efficiency of up to 80%. This electrical installation plan, includes lights installation, AC (Air Conditioner), water pump, and lifts that will be drawn into AutoCAD Software. And also this research aims to simulate the installation by using DIALux Evo Software. The result of this plan shows that the imaginary power (S) total which is needed is 650568.26 VA/ 650.57 KVA with a main security system such as 1250 A 3-phase MCCB (Molded Case Circuit Breaker) and 4 x 300 mm2 NYFGbY conductor.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: AutoCAD, DIALux Evo, electrical installation, energy saving, LED lights
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: Puryanto Ika
Date Deposited: 15 Aug 2017 04:12
Last Modified: 20 Nov 2019 02:42
URI: http://eprints.ums.ac.id/id/eprint/55553

Actions (login required)

View Item View Item