Listiyanto, Slamet and , Ir.Abdul Rochman, MT. (2017) Perencanaan Ulang Jembatan Jurug Jln.Ir.Sutami Dengan Sistem Balok Prategang Mengacu Pembebanan RSNI T-02-2005. Diploma thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Naskah Publikasi Revisi 13 April.pdf Download (2MB) |
|
PDF (Halaman Depan)
terbaru.pdf Download (1MB) |
|
PDF (BAB I)
Bab I Pendahuluan.pdf Download (528kB) |
|
PDF (BAB II)
Bab II Tinjauan Pustaka.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
|
PDF (BAB III)
Bab III Landasan Teori.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
|
PDF (BAB IV)
BAB IV Metodelogi Perencanaan.pdf Restricted to Repository staff only Download (563kB) | Request a copy |
|
PDF (BAB V)
BAB V (Plat lantai jembatan).pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (BAB VI)
BAB VI.pdf Restricted to Repository staff only Download (4MB) | Request a copy |
|
PDF (BAB VII)
BAB VII (Abutment).pdf Restricted to Repository staff only Download (2MB) | Request a copy |
|
PDF (BAB VIII)
BAB VIII (PIER).pdf Restricted to Repository staff only Download (2MB) | Request a copy |
|
PDF (BAB IX)
BAB IX.pdf Restricted to Repository staff only Download (508kB) | Request a copy |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (359kB) |
|
PDF (Lampiran)
Lampiran Tugas Akhir.pdf Restricted to Repository staff only Download (9MB) | Request a copy |
|
PDF (Pernyataan Publikasi Ilmiah)
Surat Pernyataan Publikasi ilmiah.pdf Restricted to Repository staff only Download (505kB) | Request a copy |
Abstract
The purpose of final project is to know prestressed concrete bridge construction design rules which is right, so it needs calculation relats to the standard with bridge redesigning of Jln.Ir.Sutami, Solo, Central Java. The bridge is class 1 has span of 175 m with 4 girders spans on its pier. The rules are used for refrence is rule of SNI T-02-2005 and redesign guidliness of Bridge Management System (BMS) 1992 in determining loading standard for bridge construction. Construction mechanic analysis is used for finding inside force which happens with using SAP 2000 V 15 Program. The methematic calculation in finding fast and accurat result used “Microsoft Excel 2013”program. Wherease, drawing used “AutoCAD 2012” program and “Sketchup 2015”program. This redesign is got 46 meters of girder with 2,3 meters of girder profile and for 41 meters of girder is got 2,1 meters of profile, for tendon which is used to 46 meters of girder and 41 meters is got 5 tendons and 4 tendonson longitudinal girder. In calculation of longitudinal 46 meters of girder did loss of prestress of 16,525 % and on ll 41 metersof longitudina did 16,879 % of loss of prestress . Longitudinal to stress , deflection, limit moment and shear force On bridge abutmentto be main 6 parts are breast wall, back wall, corbel, wing wall, pile capand bore pile foundaiton, wherease for pier is devided becomes 5 parts are headstock, column pier, beam diapragma, pile cap and bore pile foundation. keywords :redesing, Jurug, prestressed concrete, bridge, borepile.
Item Type: | Karya ilmiah (Diploma) |
---|---|
Uncontrolled Keywords: | Perencanaan, Jurug, beton prategang, jembatan, borepile |
Subjects: | Z Bibliography. Library Science. Information Resources > ZA Information resources |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | SLAMET LISTIYANTO |
Date Deposited: | 13 Apr 2017 07:02 |
Last Modified: | 13 Apr 2017 07:02 |
URI: | http://eprints.ums.ac.id/id/eprint/51245 |
Actions (login required)
View Item |