Analisa Ekonomi Pembangunan Waduk Pidekso Ds. Pidekso, Kec. Giriwoyo, Kabupaten Wonogiri Dengan Menggunakan Metode IRR, BCR Dan BEP

SAFITRI, DEVY APRILIA AYU and , Ir. AchmadKarimFatchan, M.T and , Gurawan Djati W, S.T, M.Eng (2017) Analisa Ekonomi Pembangunan Waduk Pidekso Ds. Pidekso, Kec. Giriwoyo, Kabupaten Wonogiri Dengan Menggunakan Metode IRR, BCR Dan BEP. Diploma thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (NASKAH PUBLIKASI)
NASKAH PUBLIKASI (1).pdf

Download (595kB)
[img] PDF (HALAMAN DEPAN)
HALAMAN DEPAN.pdf

Download (509kB)
[img] PDF (BAB I)
BAB I.pdf

Download (81kB)
[img] PDF (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (83kB)
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (309kB)
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (19kB)
[img] PDF (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (340kB)
[img] PDF (BAB VI)
BAB VI.pdf
Restricted to Repository staff only

Download (85kB)
[img] PDF (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (5kB)
[img] PDF (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (4MB)
[img] PDF (PERNYATAAN PUBLIKASI)
SURAT PERNYATAAN NASKAH PUBLIKASI.pdf
Restricted to Repository staff only

Download (160kB)

Abstract

Pidekso reservoir is one of the reservoir in Wonogiridistric that will develop in 2017. Pidekso reservoir function is to supply water irrigation, 1500 ha andmunipical water, 2500 person. With the developing Pidekso reservoir, the production of ricefield can increased and that is increase the farmers income. The research scope is analysis economic value of Pidekso Reservoir by tree method, namely : BCR (Benefit Cost Ratio), IRR (Internal Rate of Return) and the BEP (Break event Point). Result of the Research is the Net Present Value (NPV) of Rp. 13,288,118,378; NPV >0 (it is worth it), Benefit Cost Ratio (BCR) 1.56> 1 (investment worth it), Internal Rate of Return 11.01% (the project is feasible), Break Event Point 12.48 when everage cashflow and age of the reservoir are 3 years, 50 year, respect fively. Therefore, the contruction investment is feasible. And then contruction of Pidekso Reservoir can be implemented.

Item Type: Karya ilmiah (Diploma)
Uncontrolled Keywords: BEP, IRR ,BCR , Pidekso Reservoir , Economic Analysis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: DEVY APRILIA AYU SAFITRI
Date Deposited: 08 Apr 2017 06:14
Last Modified: 08 Apr 2017 06:14
URI: http://eprints.ums.ac.id/id/eprint/51034

Actions (login required)

View Item View Item