Prarancangan Pabrik Metanol Dari Batubara Dengan Proses Gasifikasi Kapasitas Produksi 100.000 Ton/Tahun

Asokawati, Anggie Fatimah and , Kusmiyati, S.T., M.T., Ph.D. and , M. Mujiburohman, S.T., M.T., Ph.D. (2016) Prarancangan Pabrik Metanol Dari Batubara Dengan Proses Gasifikasi Kapasitas Produksi 100.000 Ton/Tahun. Diploma thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (1MB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (16MB)
[img] PDF (BAB I)
10. BAB I Edit.pdf

Download (377kB)
[img] PDF (BAB II)
12. BAB II Edit (A).pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (BAB III)
13. BAB III Edit.pdf
Restricted to Repository staff only

Download (392kB) | Request a copy
[img] PDF (BAB IV)
14. BAB IV Edit (A).pdf
Restricted to Repository staff only

Download (701kB) | Request a copy
[img] PDF (Bab V)
15. BAB V Edit (A).pdf
Restricted to Repository staff only

Download (268kB) | Request a copy
[img] PDF (Bab VI)
16. BAB VI Edit (A).pdf
Restricted to Repository staff only

Download (722kB) | Request a copy
[img] PDF (BAB VII)
17. BAB VII Edit (A).pdf
Restricted to Repository staff only

Download (114kB) | Request a copy
[img] PDF (Daftar Pustaka)
18. DAFTAR PUSTAKA.pdf

Download (191kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
Pernyataan Publikasi Ilmiah.pdf
Restricted to Repository staff only

Download (540kB) | Request a copy

Abstract

Methanol plant with raw material from gas synthesis of coal capacity 100.000 ton/years operated 330 days per years. Methanol manufactured process using fixed bed reactor. Reaction on fixed bed reactor occur gas phase, and exothermic, with operation condition non adiabatic at temperatur 2000C and pressure 48 atm. This industry include kind of high risk because operate above atmospheric pressure. Coal demand as much as 12.626,262 kg/hours. The product is methanol as much as 9.097,242 kg/hours. Utility process include water supply from river (Kapuas, West Kalimantan), steam supply from boiler with diesel fuel, electricity needs supplied by PLN and 1 generator set 500 kW as stand-by with diesel fuel. This plant is established in Rasau, West Kalimantan, Indonesia, on 2025, with land area 28.575 m2 and employees 159 people. The results of the economic analysis of the obtained methanol plant pradesign fixed capital investment (FCI) of Rp 149.619.846.137 and working capital (WC) Rp 88.799.730.394. Feasibility analysis results obtained from the return on investment (ROI) before tax after tax 44,82% and 31,37%. Pay Out Time (POT) before and after- tax 1,82 and 2,42 of years. Break Even Point (BEP) 42,05%, Shut Down Point (SDP) of 22,65% and a Discounted Cash Flow (DCF) of 30,28%. The results of the economic analysis concluded that the methanol plant from coal with gasification process capacity of 100.000 ton/year is feasible to set.

Item Type: Karya ilmiah (Diploma)
Uncontrolled Keywords: methanol, coal, gasification process
Subjects: T Technology > TP Chemical technology
Divisions: Fakultas Teknik > Teknik Kimia
Depositing User: ANGGIE FATIMAH ASOKAWATI
Date Deposited: 03 Nov 2016 10:15
Last Modified: 03 Nov 2016 10:15
URI: http://eprints.ums.ac.id/id/eprint/47665

Actions (login required)

View Item View Item