Zarmica, Ade Juli and , M Mujiburrohman, S.T., M.T., Ph.D and , Rois Fatoni, S.T., M.Sc., Ph.D. (2016) Prarancangan Pabrik Sodium Silikat Dari Pasir Silika Dan Natrium Hidroksida Kapasitas 65.000 Ton Per Tahun. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah publikasi)
NASKAH PUBLIKASI-ade.pdf Download (681kB) |
|
PDF (HALAMAN DEPAN)
HALAMAN DEPAN.pdf Download (381kB) |
|
PDF (BAB I)
BAB I.pdf Download (383kB) |
|
PDF (BAB II)
BAB II.pdf Restricted to Repository staff only Download (974kB) | Request a copy |
|
PDF (BAB III)
BAB III.pdf Restricted to Repository staff only Download (389kB) | Request a copy |
|
PDF (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (460kB) | Request a copy |
|
PDF (BAB V)
BAB V.pdf Restricted to Repository staff only Download (322kB) | Request a copy |
|
PDF (BAB VI)
BAB VI.pdf Restricted to Repository staff only Download (740kB) | Request a copy |
|
PDF (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (322kB) |
|
PDF (LAMPIRAN)
LAMPIRAN.pdf Restricted to Repository staff only Download (830kB) | Request a copy |
|
PDF (PERNYATAAN PUBLIKASI)
PERNYATAAN PUBLIKASI.pdf Restricted to Repository staff only Download (144kB) | Request a copy |
Abstract
Sodium silicate plant with raw materials of sodium hydroxide and silica sand, is planned to be established in the industrial area of Gresik with a capacity of 65,000 tons/year. In the process of producing sodium silicate is performed using continueous stirred tank reactor (CSTR) by reacting sodium hydroxide and silica sand. In the reactor the reaction undergoes liquid-liquid phase, endothermic, with operating temperatures of 220OC and a pressure of 24 bar. To produce sdium silica the process requires raw materials including 3029.54 kgs/hour of sodium hydroxide and 5696.8 kgs/hour of silica sand. The process also needs utilities including 64,394.34 kgs/hour of water, 8,175.9 kgs/hour of steam, 520 liters/hour of fuel diesel, 587.4 kW of electricity obtained from the PLN, and 587.4 kW of generator as backup need 79.01 liters / hour of fuel. Sodium silicate plant with a capacity of 65,000 tons/year. The plant is planned to operate for 330 days/year, and will be established in East Java Gresik Industrial area with a land area of 12,371 m2 and the number of employees is 188 people. The sodium silicate plant require the production costs Rp241,686,040,102.00. The economic analysis of this plant showed a profit before tax of Rp66,338,756,994.00 per year, after tax profits reached Rp49,754,667,745.00 25% per year. The Percent Return On Investment (ROI) before tax 27.4% and 20.6% after taxes. The Pay Out Time (POT) before tax is was 2.67 years and 3.27 years after tax. The Break Even Point (BEP) amounted to 53.6% and the Shut Down Point (SDP) of 28.2%. The Interval rate of return (IRR) accounted for 46.05%. From these analysis economy concluded that the plant is profitable and feasible to set.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Sodium Silicate, Chemical Plant,Silica Sand, Gersik. |
Subjects: | Q Science > Q Science (General) Q Science > QD Chemistry T Technology > TP Chemical technology |
Divisions: | Fakultas Teknik > Teknik Kimia |
Depositing User: | ADE JULI ZARMICA |
Date Deposited: | 02 Nov 2016 09:51 |
Last Modified: | 02 Nov 2016 09:51 |
URI: | http://eprints.ums.ac.id/id/eprint/47540 |
Actions (login required)
View Item |