Kurniasari, Frista and , Mochamad Solikin, S.T., M.T., Ph.D (2016) Evaluasi Pengendalian Waktu Dan Biaya Menggunakan Metode Pert(Studi Kasus: Proyek Pembangunan Gedung Ruang Kuliah Iain Pontianak). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Naskah publikasi-90.pdf Download (1MB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (573kB) |
|
PDF (BAB I)
BAB I Pendahuluan.pdf Download (230kB) |
|
PDF (BAB II)
BAB II Tinjauan Pustaka.pdf Restricted to Repository staff only Download (226kB) |
|
PDF (BAB III)
BAB III Landasan Teori.pdf Restricted to Repository staff only Download (394kB) |
|
PDF (BAB IV)
BAB IV Tahapan Penelitian.pdf Restricted to Repository staff only Download (287kB) |
|
PDF (BAB V)
BAB V Pembahasan.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (BAB VI)
BAB VI Penutup.pdf Restricted to Repository staff only Download (92kB) |
|
PDF (DAFTAR PUSTAKA)
Daftar Pustaka.pdf Restricted to Repository staff only Download (17kB) |
|
PDF (LAMPIRAN)
LAMPIRAN_1.pdf Restricted to Repository staff only Download (24MB) |
|
PDF (Pernyataan Publikasi Ilmiah)
Doc2.pdf Restricted to Repository staff only Download (169kB) |
|
PDF
Naskah publikasi-90.pdf Download (1MB) |
Abstract
Success in the process of project completion should be kept in 3 constraint, there are: in accordance with determined specifications, according to the specified time, and according to the specified cost. To achieve substantial and ideal construction then needed a good structured management so that projects can be completed on time and on schedule. This research aimed to analyze the time which is most effective and efficient, also the completion probability project of Pontianak IAIN Lecture Hall Building construction, Kalimantan Barat and compare between implementation in the field with calculation using PERT method (Project Evaluation Review Technique). This research is included quantitative research, the type of data that obtained is not only collected and arranged but also data analysis. The data obtained by conducting interviews and project data. Analysis methods which used is PERT (Project Evaluation Review Technique) method by the reason that the level of uncertainty is enormous and time schedule planning is more important than costs planning. PERT method is used to obtain time analysis, effective and efficient cost using PERT diagram. The results that is obtained from this final assignment in the form of Trial and Error I with 66 days of crashing time from normal day which is 77 days and have a critical time of 57 days with generating critical cost of Rp 13,668,720,557.68 with the successful probability 11 days faster from critical time is 76,11%, whereas Trial and Error II with 63 days of crashing time 14 days faster from normal day has a critical 57 days by generating critical cost of Rp 21,234,955,108.36 with the successful probability 6 days faster from critical time is 73,89% and Trial and Error III in the its execution late 7 days of schedules have critical time 82 days with generating critical cost of Rp 24,547,837,367.39 and fine penalty cost of Rp 166,095,363.74 with the successful probability 2 days slower from critical time is 56,36%.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | crashing, critical time, critical cost, PERT diagram, trial and error. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | FRISTA KURNIASARI |
Date Deposited: | 05 Oct 2016 09:48 |
Last Modified: | 05 Oct 2016 09:52 |
URI: | http://eprints.ums.ac.id/id/eprint/46642 |
Actions (login required)
View Item |