Evaluasi Anggaran Biaya Dan Pelaksanaan Pada Proyek Pembangunan Gedung Kantor Kecamatan Di Sragen (Studi Kasus Pembangunan Gedung Kantor Kecamatan Di Sragen

Murtono, Joko and , Ir. Sri Sunarjono, MT, Ph.D and , Ir. H. Muhammad Nur Sahid, M.M., M.T. (2016) Evaluasi Anggaran Biaya Dan Pelaksanaan Pada Proyek Pembangunan Gedung Kantor Kecamatan Di Sragen (Studi Kasus Pembangunan Gedung Kantor Kecamatan Di Sragen. Thesis thesis, Universitas Muhammadiyah Surakarta.

WarningThere is a more recent version of this item available.
[img] PDF (NASKAH PUBLIKASI)
11. NASKAH PUBLIKASI.pdf

Download (1MB)
[img] PDF (HALAMAN DEPAN)
02. HALAMAN DEPAN.pdf

Download (1MB)
[img] PDF (BAB I)
03. BAB I.pdf

Download (95kB)
[img] PDF (BAB II)
04. BAB II.pdf
Restricted to Repository staff only

Download (221kB)
[img] PDF (BAB III)
05. BAB III.pdf
Restricted to Repository staff only

Download (74kB)
[img] PDF (BAB IV)
06. BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img] PDF (BAB V)
07. BAB V.pdf
Restricted to Repository staff only

Download (79kB)
[img] PDF (DAFTAR PUSTAKA)
08. DAFTAR PUSTAKA.pdf

Download (79kB)
[img] PDF (LAMPIRAN)
09. LAMPIRAN.pdf
Restricted to Repository staff only

Download (6MB)
[img] PDF (PERNYATAAN PUBLIKASI ILMIAH)
01. SURAT PERNYATAAN PUBLIKASI KARYA ILMIAH.pdf
Restricted to Repository staff only

Download (483kB)

Abstract

The purpose of this study are to know and analyze: a) planning and realization of work development in the subdistrict office building of Sragen Regency, b) the cost of implementing the construction of office buildings in Sragen Regency, c) scheduling implementation of projects development when there is a delay. Based on the results of research in previous chapters, it can be concluded that 1) implementation of the subdistrict office building development in Sragen Regency there is a delay work, 2) there is a difference between the realization with the cost of the execution plan of subdistrict office building in Sragen where the cost of implementation is lower than the cost of the plan, 3) based on the planning and implementation of development time of subdisctrics office building in Sragen Regency occurred rescheduling.

Item Type: Karya ilmiah (Thesis)
Uncontrolled Keywords: evaluation, budget, project implementation, construction of buildings
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Pasca Sarjana > Magister Teknik Sipil
Depositing User: Unnamed user with username s100110017
Date Deposited: 09 Sep 2016 08:48
Last Modified: 09 Sep 2016 08:48
URI: http://eprints.ums.ac.id/id/eprint/46485

Available Versions of this Item

Actions (login required)

View Item View Item