Prarancangan Pabrik Asetaldehida dengan Proses Dehidrogenasi Etanol Kapasitas 30.000 Ton/Tahun

Ainiyah, Oktaviana Lupita and , Ir.Herry Purnama, M.T., Ph.D. and , Ir. Haryanto AR., M.S. (2016) Prarancangan Pabrik Asetaldehida dengan Proses Dehidrogenasi Etanol Kapasitas 30.000 Ton/Tahun. Diploma thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Bab I)
04.BAB I.pdf

Download (150kB)
[img] PDF (Bab II)
05. BAB II.pdf
Restricted to Repository staff only

Download (296kB) | Request a copy
[img] PDF (Bab III)
06.BAB III.pdf
Restricted to Repository staff only

Download (100kB) | Request a copy
[img] PDF (Bab IV)
07. BAB IV.pdf
Restricted to Repository staff only

Download (212kB) | Request a copy
[img] PDF (Bab V)
08.BAB V.pdf
Restricted to Repository staff only

Download (107kB) | Request a copy
[img] PDF (Bab VI)
09.BAB VI.pdf
Restricted to Repository staff only

Download (138kB) | Request a copy
[img] PDF (Bab VII)
10.BAB VII.pdf
Restricted to Repository staff only

Download (44kB) | Request a copy
[img] PDF (Daftar Pustaka)
11.DAFTAR PUSTAKA.pdf

Download (35kB)
[img] PDF (Lampiran)
12. LAMPIRAN.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
01. SURAT PERNYATAAN PUBLIKASI.pdf
Restricted to Repository staff only

Download (85kB) | Request a copy
[img] PDF (Halaman Depan)
Cover.pdf

Download (420kB)
[img] PDF (Naskah Publikasi)
naskah publikasi (2).pdf

Download (572kB)

Abstract

Acetaldehyde in Indonesia still needs to rely on imports from abroad. For that is the establishment of acetaldehyde plant with a capacity of 30.000 ton/year is very important to meet the needs of acetaldehyde in Indonesia. Raw material for making acetaldehyde is ethanol reacted dehydrogenation process using the fixed bed multitube reactor at a temperatur of 260-290oC and a pressure of 1,25 atm with solid catalyst Cr2Cu2O5. This reaction takes place in endothermic and irreversible. Conversion of reaction is 50% and yield 85%. The manufacturer of acetaldehyde plant will be established in Gresik, East Java by area 60.000 m2. Total raw material requirement ethanol is 7920,9102 kg/hr, total product produced is 3750 kg/hr, total water needs for all units is 105,8817 m3/hr, total electricity needs is 194,0699 kW and total fuel needs is 99,7345 L/hr. Based on economic analysis, the manufacturer of acetaldehyde plant requires fixed capital and working capital of Rp 537.996.201.110,92 and Rp 425.706.083.282,58, other than that obtained return of investment before taxes of 38,91%, after taxes of 27,24%, break even point 46,68%, shut down point 26,28%, pay out time before taxes of 2,04 year, after taxes of 2,69 year, and discounted cash flow 24,2%. Based on the calculation of the economic analysis, it can be concluded that this manufacturer of acetaldehyde plant is reasonable to establish.

Item Type: Karya ilmiah (Diploma)
Uncontrolled Keywords: acetaldehyde, dehydrogenation, ethanol
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Teknik Kimia
Depositing User: OKTAVIANA LUPITA AINIYAH
Date Deposited: 30 Jul 2016 02:29
Last Modified: 30 Jul 2016 02:29
URI: http://eprints.ums.ac.id/id/eprint/44651

Actions (login required)

View Item View Item