Preliminary Plant Design Of Chloroform From Acetone And Bleaching Powder Capacity 19,000 Tonnes Per Year

QOMAROH, Qomaroh and , M. Mujiburohman, S.T., M.T., Ph.D. and , Emi Erawati, S.T., M.Eng. (2014) Preliminary Plant Design Of Chloroform From Acetone And Bleaching Powder Capacity 19,000 Tonnes Per Year. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI.pdf

Download (3MB)
[img] PDF (Halaman Depan)
COVER.pdf

Download (3MB)
[img] PDF (Bab I)
CHAPTER 1.pdf

Download (640kB)
[img] PDF (Bab II)
CHAPTER 2.pdf
Restricted to Repository staff only

Download (647kB)
[img] PDF (Bab III)
CHAPTER 3.pdf
Restricted to Repository staff only

Download (107kB)
[img] PDF (Bab IV)
CHAPTER 4.pdf
Restricted to Repository staff only

Download (592kB)
[img] PDF (Bab V)
CHAPTER 5.pdf
Restricted to Repository staff only

Download (263kB)
[img] PDF (Bab VI)
CHAPTER 6.pdf
Restricted to Repository staff only

Download (605kB)
[img] PDF (Bab VII)
CHAPTER 7.pdf
Restricted to Repository staff only

Download (105kB)
[img] PDF (Datar Pustaka)
DAFTAR PUSTAKA.pdf

Download (31kB)
[img] PDF (Lampiran)
APPENDIX.pdf
Restricted to Repository staff only

Download (2MB)
[img] PDF (Surat Pernyataan Publikasi)
SURAT PERNYATAAN PUBLIKASI KARYA ILMIAH.pdf
Restricted to Repository staff only

Download (93kB)

Abstract

Indonesia still has not built any chloroform plants. To meet the need of society for chloroform, Indonesia is still importing from other countries. The plant capacity is then determined to reach 19,000 tonnes/year in Cilegon, Banten. Chloroform is produced by reactions acetone 1307.300 kg/year and bleaching powder 13073.002 kg/year. Using reactor which is equiped with agitator at temperature 50℃ and pressure 1 atm also 2 hours for reaction. Besides being the main product, chloroform within reactor also produces calcium acetate Ca(CH3COO)2, calcium hydroxide (Ca(OH)2), calcium chloride (CaCl2). With area of plant 38,857 m2, total of water needs is 147 m3/hours, steam required is 2,506.886 kg/h, for electricity is 529 KW, fuel requirement is 82.79 L/h, this plant will start to produce in 2015. The economic analysis concludes that fixed manufacturing cost (Fa) is 462,493,237,829. Variable cost (Va) is 7,852,508,693,058. Regulated cost (Ra) is 7,941,777,516,246. Selling product (Sa) is 19,629,796,640,852. ROI (Return on Investment) before and after tax is 94.811% and 66.36%. POT (Pay Out Time) before and after tax is 0.95 years and 1.31 years. BEP (Break-even Point) 45.75%, and SDP (Shutdown Point) 38.32%. While DCF (Discounted Cash Flow) as 35.61%. From the economic analysis, this plant is recommended to build.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: chloroform, acetone, bleaching powder.
Subjects: T Technology > TP Chemical technology
Divisions: Fakultas Teknik > Teknik Kimia
Depositing User: Cahyana K. Widada
Date Deposited: 01 Dec 2015 01:34
Last Modified: 17 Oct 2021 14:32
URI: http://eprints.ums.ac.id/id/eprint/39720

Actions (login required)

View Item View Item