Pamungkas, Usman and , Dr. Suwaji, M.Kes and , Tarwaka, PGDip Sc, M.Erg (2015) Perbedaan Tingkat Kelelahan Subyektif Antara Shift Pagi Dan Malam Pada Pekerja Bagian Produksi Pengolahan Beton Di PT. Wijaya Karya Beton Tbk Kabupaten Boyolali. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi.pdf Restricted to Repository staff only Download (481kB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (2MB) |
|
PDF (Bab I)
Bab I.pdf Download (23kB) |
|
PDF (Bab II)
Bab II.pdf Restricted to Repository staff only Download (215kB) |
|
PDF (Bab III)
Bab III.pdf Restricted to Repository staff only Download (966kB) |
|
PDF (Bab IV)
Bab IV.pdf Restricted to Repository staff only Download (131kB) |
|
PDF (Bab V)
Bab V.pdf Restricted to Repository staff only Download (94kB) |
|
PDF (Bab VI)
Bab VI.pdf Restricted to Repository staff only Download (15kB) |
|
PDF (Daftar Pustaka)
Daftar Pustaka.pdf Download (71kB) |
|
PDF (Lampiran)
Lampiran.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (Naskah Publikasi)
Naskah Publikasi.pdf Download (868kB) |
Abstract
Shift working often impacts relating to fatigue subjectivein which happened in long term will be chronic fatigue. PT Wijaya Karya Beton enforces morning and night shift for the workers. Night shift workers tend to feel sleepy, thirsty, dizzy, lost concentration and feeling to take rest while working. The aims of this research are to find out the differences of subjective fatigue level between morning and night shift workers in the process of concrete production in PT. Wijaya Tbk. District Boyolali. The research design of this research was analytical observational study which employed cross sectional approach. The sample of this research came from workers, which consist of 106 workers. Data of this research were taken from identity sheet, respondent and measuring fatigue level using KAUPK2 questionnaire. The technique of analyzing the difference used Mann-Whitney statistic test. The result of the research, the score was p< 0,0001 which implied there were differences of subjective fatigue level between morning and night shift workers in the process of concrete production in PT. Wijaya Karya Tbk. District Boyolali. Suggestions for PT. Wijaya Karya Tbk. District Boyolali is providing rest area which is comfortable for the workers
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Kelelahan,shift kerja |
Subjects: | R Medicine > R Medicine (General) |
Divisions: | Fakultas Ilmu Kesehatan > Kesehatan Masyarakat |
Depositing User: | Setiawan Setiawan BL |
Date Deposited: | 12 Sep 2015 02:44 |
Last Modified: | 12 Oct 2021 06:10 |
URI: | http://eprints.ums.ac.id/id/eprint/37405 |
Actions (login required)
View Item |