Penerapan Predictive Maintenance Equipment Prioritas Mesin Electro Static Painting Dengan Menggunakan Metode Pemantauan Kuat Arus

Ariyana, Yuniar Listiya and , Much. Djunaidi ST., MT. (2022) Penerapan Predictive Maintenance Equipment Prioritas Mesin Electro Static Painting Dengan Menggunakan Metode Pemantauan Kuat Arus. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI_YUNIAR LISTIYA ARIYANA.pdf

Download (738kB)
[img] PDF (Surat Pernyataan Publikasi)
Surat-Pernyataan-Terbaru-YUNIAR LISTIYA ARIYANA.pdf
Restricted to Repository staff only

Download (374kB)

Abstract

Electro Static Painting (ESP) is a painting machine at PT. XYZ. The Electro Static Painting machine has the most critical equipment, that is motor exhaust impeller. The motor exhaust impeller is used to move the impeller in sucking air and paint on the spray both ESP machine. The application of predictive maintenance is a treatment by predicting the occurrence of failures that occur in the motorcycle exhaust impeller. The results of the current monitoring data, obtained the classification of the current motor exhaust impeller, it is low current, medium current and peak. the current value at low current is 9-9.4, medium current is 9.4-9.9 and peak current is 9.9-10.3. Maintenance that needs to be done when the current is at peak current. Implementation of predictive maintenance with 2 steps. The first step is monitor current where monitoring is carried out 406.3 hours after maintence. The second step is to carry out maintenance when peak current.

Item Type: Thesis (Skripsi)
Uncontrolled Keywords: Maintenance, Predictive Maintenance, Current, Monitoring
Subjects: T Technology > TI Industrial Engineering
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Unnamed user with username d600180004
Date Deposited: 18 May 2022 03:37
Last Modified: 18 May 2022 03:37
URI: http://eprints.ums.ac.id/id/eprint/100006

Actions (login required)

View Item View Item