Wibowo, Torres Suares Sugandi and , Mochamad Solikin, ST, MT, Ph.D. (2022) Penerapan Building Information Modeling (Bim) Pada Pembangunan Fasilitas Umum Masjid Kota Surakarta Dengan Software Autodesk. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI TORRES.pdf Download (1MB) |
|
PDF (Halaman Depan)
1. Halaman Depan.pdf Download (2MB) |
|
PDF (Bab I)
2. BAB 1 Pendahuluan.pdf Download (153kB) |
|
PDF (Bab II)
3. BAB 2 Tinjauan Pustaka.pdf Restricted to Repository staff only Download (146kB) |
|
PDF (Bab III)
4. BAB 3 Landasan Teori.pdf Restricted to Repository staff only Download (249kB) |
|
PDF (Bab IV)
5. BAB 4 Metode Pelaksanaan.pdf Restricted to Repository staff only Download (265kB) |
|
PDF (Bab V)
6. BAB 5 Pelaksanaan Kegiatan.pdf Restricted to Repository staff only Download (22MB) |
|
PDF (Bab VI)
7. BAB 6 Hasil & Pembahasan.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (Bab VII)
8. BAB 7 Kesimpulan & Saran.pdf Restricted to Repository staff only Download (144kB) |
|
PDF (Daftar Pustaka)
9. Daftar Pustaka.pdf Download (146kB) |
|
PDF (Lampiran)
10. Lampiran.pdf Restricted to Repository staff only Download (15MB) |
|
PDF (Surat Pernyataan Publikasi)
Surat Pernyataan Publikasi Ilmiah.pdf Restricted to Repository staff only Download (50kB) |
Abstract
Every development work generally has its management method, especially Indonesia, which still uses conventional methods which are known to have several weaknesses, such as the potential for errors to occur and lead to revisions. On the other hand, as technology advances, a method emerged, namely Building Information Modeling (BIM), which is a way to create digital assets by creating 3D objects. Through this method, collision detection analysis can also be carried out to minimize the occurrence of modeling errors. In this research, the researcher uses software core Autodesk such as Revit and Navisworks. For this final project, the objectives include analyzing the difference between the estimated work volume output from Autodesk Revit software with manual estimates, analyzing the difference in making work time between the BIM and conventional methods using the S curve, analyzing the accuracy of the estimated output cost budget from Autodesk Revit software if applied the implementation in the field, and analyze the application of clash detection in the Building Information Modeling (BIM) method. Furthermore, regarding the implementation method of this final project, the first is to collect materials and materials from the research object, namely public facilities in the Surakarta city mosque construction project. Next is to do 3D modeling (3D modeling of building objects), 4D (scheduling modeling), 5D (calculation of volume estimates). and budget), and lastly clash detection and then end with the presentation of the results. In this final project, the accuracy of Revit and manual concrete volume calculations is 91.07%, ironwork is 99.85%, and formwork work is 99.19%. Then the scheduling uses Autodesk Navisworks, where every work is connected to 3D objects and animations. Furthermore, the application of clash detection can show the location of design errors which can lead to minimizing revisions and losses.
Item Type: | Thesis (Skripsi) |
---|---|
Uncontrolled Keywords: | BIM, Autodesk Revit, Autodesk Navisworks, clash detection, output, estimation, method |
Subjects: | T Technology > TA Civil Engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | TORRES SUARES SUGANDI WIBOWO |
Date Deposited: | 11 Apr 2022 02:10 |
Last Modified: | 11 Apr 2022 02:10 |
URI: | http://eprints.ums.ac.id/id/eprint/99235 |
Actions (login required)
View Item |