Setiyawan, Dani and , Ir. Ahmad Kholid Al Ghofari, ST. MT. (2020) Perencanaan Sistem Perawatan Mesin Produksi Roblon M33 Berbasis Reliability Centered Maintenance(RCM) (Studi Kasus: PT. Sumbertex, Batang). Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
Naskah Publikasi.pdf Download (567kB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (394kB) |
|
PDF (Bab I)
BAB I.pdf Download (89kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (314kB) | Request a copy |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (27kB) | Request a copy |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (766kB) | Request a copy |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (80kB) | Request a copy |
|
PDF (Daftar Pustaka)
Daftar Pustaka.pdf Download (80kB) |
|
PDF (Lampiran)
Lampiran.pdf Restricted to Repository staff only Download (589kB) | Request a copy |
|
PDF (Surat Pernyataan Publikasi)
Surat Pernyataan.pdf Restricted to Repository staff only Download (102kB) | Request a copy |
Abstract
PT Sumbertex is a manufacturing company engaged in the plastic rope industry in Indonesia. In the production process PT. Sumbertex is still experiencing frequent problems with engine failures, one of the vital machines used for the production of mini size plastic rope who suffered most frequent damage is the new Roblon M33 engine. Judging from the problem of this research, with the Reliability Centered Maintenance approach, suggest for a maintenance system aimed at the type of damage that is in the machine, analyzes the priority risk of failure, provides the type of action taken on critical components using LTA and Task Selection, and Settings period of time for component repair / replacement periodically. After conducting research, it is obtained from the results of 11 types of failed modes identified, there is 6 proposed types of Time Directed actions, 4 proposed types of Condition Directed actions, and 1 proposed types of Design Modification action, which is to discuss the type of TD action critical components of Coupling Canvas, Connection Timing Belt, Rear Bearing Block, Coiling Unit, and Steering Wheel Thread Drat repair / replacement time intervals and Realibiliy values in a ro is 253.04 hours 33.27%, 487.8 hours 36.79%, 606.18 hours 33.27%, 581 , 39 hours 36.79%, and 636.94 hours 36.79%
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Sistem Perawatan, RCM, Task Selection |
Subjects: | Q Science > Q Science (General) T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | DANI SETIYAWAN |
Date Deposited: | 13 Aug 2020 06:10 |
Last Modified: | 13 Aug 2020 06:10 |
URI: | http://eprints.ums.ac.id/id/eprint/84709 |
Actions (login required)
View Item |