Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping (Vsm) Pada Kain 100% Cotton Carded(Ta 118 62 63 Rf Rf / Aa) Departemen weaving II

Zhafran, Muhammad Adiatma and -, Eko Setiawan S.T., M.T., Ph.D. (2019) Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping (Vsm) Pada Kain 100% Cotton Carded(Ta 118 62 63 Rf Rf / Aa) Departemen weaving II. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
Naskah Publikasi.pdf

Download (496kB)
[img] PDF (Halaman Depan)
Halaman Depan.pdf

Download (828kB)
[img] PDF (BAB I)
BAB I.pdf

Download (110kB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (102kB) | Request a copy
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (627kB) | Request a copy
[img] PDF (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (90kB) | Request a copy
[img] PDF (Daftar Pustaka)
Daftar Pustaka.pdf

Download (189kB)
[img] PDF (Lampiran)
Lampiran.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Surat Pernyataan Publikasi Ilmiah)
Surat Pernyataan Publikasi Ilmiah.pdf
Restricted to Repository staff only

Download (215kB) | Request a copy

Abstract

PT Dan Liris is one of the manufacturing company in Sukoharjo, Central Java that consists of garment and textile division. This research focused in fixing production on 100% cotton carded fabrics (TA 118 62 63 Rf Rf / AA) at weaving 2 departement. There are several important problems in this departement about quantity of goods recently being very wasteful, also there are problems about the lack of efectivity and efficiency in operator’s activity. Those troubles solved with the implementation of lean manufacturing using Value Stream Mapping (VSM) methods. In using VSM, there are several tools that will be used, it is called Value Stream Mapping Analysis Tool (VALSAT). In this research, it has been achieved a goal in fixing lead time 55,417 minutes. Beside, there are also fixing some dominating wastes it is waiting, transportation dan unnecessary inventory. Keywords: Lead Time,Value Stream Mapping, Weaving.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: Lead Time,Value Stream Mapping, Weaving.
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: MUHAMMAD ADIATMA ZHAFRAN
Date Deposited: 02 May 2019 07:42
Last Modified: 02 May 2019 07:42
URI: http://eprints.ums.ac.id/id/eprint/72362

Actions (login required)

View Item View Item