MINIMASI WASTE PADA USAHA BANDENG PRESTO DENGAN METODE VALUE STREAM MAPPING (Studi Kasus: UKM Rindang Pati)

Wiradana, Kukuh Adi and , Mila Faila Sufa, ST., MT (2018) MINIMASI WASTE PADA USAHA BANDENG PRESTO DENGAN METODE VALUE STREAM MAPPING (Studi Kasus: UKM Rindang Pati). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF
HALAMAN DEPAN FIX.pdf

Download (1MB)
[img] PDF (Bab I)
BAB I.pdf

Download (3MB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (3MB)
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (3MB)
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (3MB)
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (3MB)
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (3MB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (3MB)
[img] PDF (SURAT PERNYATAAN NASKAH PUBLIKASI)
SURAT PERNYATAAN NASKAH PUBLIKASI.pdf
Restricted to Repository staff only

Download (232kB)
[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI NEW-2.pdf

Download (1MB)

Abstract

Rindang UKM is a form of milkfish processing business in Pati, Central Java. One form of the product is the manufacture of presto milkfish. In this study aims to determine the type of waste that is in the production process. Through a direct approach to interview and then distributing questionnaires that aim to find out the most dominant waste of the seven existing waste. Making a big picture mapping can determine the production flow time of 611 minutes and there is an information flow and material flow. The value stream mapping method is very suitable with the existing conditions because it includes many elements in the field. With the detailed mapping tools, you can make recommendations for improvements that are useful for the business. Process activity mapping explains that there are 31 activities with 575 minutes of production. With the proposed improvement to be 559 minutes with 25 activities, the percentage of NNVA became 48.38% and VA became as much as 32.25%. The supply chain response matrix describes the production lead time for 16.6 days obtained from the sum of inventory quantities and lead times.

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: bandeng, pemborosan, seven waste, value stream mapping
Subjects: Q Science > Q Science (General)
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: KUKUH ADI WIRADANA
Date Deposited: 13 Nov 2018 09:39
Last Modified: 13 Nov 2018 09:39
URI: http://eprints.ums.ac.id/id/eprint/68886

Actions (login required)

View Item View Item