Krisna, Gilang Wahyu and -, Hary prasetyo,ST., MT., Ph.D (2018) Penjadwalan Produksi Kursi Hongkong Dengan Metode Jadwal Aktif Dan Non-Delay Untuk Meminimumkan Makespan Studi Kasus: Home Industry Aziz Mebel Purwodadi. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI SKRIPSI.pdf Download (1MB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (1MB) |
|
PDF (Bab I)
BAB 1.pdf Download (191kB) |
|
PDF (Bab II)
BAB II.pdf Restricted to Repository staff only Download (505kB) | Request a copy |
|
PDF (Bab III)
BAB III.pdf Restricted to Repository staff only Download (309kB) | Request a copy |
|
PDF (Bab IV)
BAB IV.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Bab V)
BAB V.pdf Restricted to Repository staff only Download (181kB) | Request a copy |
|
PDF (Daftar Pustaka)
Daftar Pustaka.pdf Download (393kB) |
|
PDF (Lampiran)
Lampirann.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
PDF (Surat Pernyataan)
Pernyataan.pdf Restricted to Repository staff only Download (249kB) | Request a copy |
Abstract
The purpose of research to determine the sequence of production process by making a scheduling until the production process time minimum and good scheduling planning producers can implement into other furniture production plans to minimizing makespan. Several methods can be use to minimize makespan is active and non-delay algorithms. Active algorithm is scheduling uses SPT rules, priority is given to jobs with the shortest processing time and then followed by larger jobs. Whereas the non delay algorithm is scheduling that allows one or more operations at the same time. Using Win QS software is to compare scheduling time with active and non-delay schedule algorithms. The stages research is observation and interview the UKM owners, data, data processing, and comparing the results of makespan scheduling. From the scheduling method conducted by UKM Aziz Mebel 33427 seconds with idle time 878 seconds and mean flow time 6866.41 seconds, while the scheduling with active schedule method produces makespan 32530 seconds with idle time 845 seconds and mean flow time 4644.66 seconds,method non delay makes makespan 32879 seconds with idle time 1407 seconds and mean flow time 6433 seconds while the method random generation and pick the best produces makespan 33420 seconds with idle time 1422 and mean flow time 6841 seconds. with these results it is known that the selected alternative scheduling is by scheduling an active schedule method which can save a total working time of 2.68%, which is 897 seconds or 14 minute and 57 second. Keywords: Active Schedule, Job Shop, Non delay Schedule, Production Scheduling
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Jadwal Aktif, Jadwal Non Delay, Job Shop, Penjadwalan Produksi |
Subjects: | Q Science > Q Science (General) |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | GILANG WAHYU KRISNA |
Date Deposited: | 13 Nov 2018 09:56 |
Last Modified: | 13 Nov 2018 09:56 |
URI: | http://eprints.ums.ac.id/id/eprint/68876 |
Actions (login required)
View Item |