Jonafar, Dohan Riski and , Ahmad Kholid Al Ghofari, ST. MT. (2018) Usulan Penerapan Total Productive Maintenance Guna Meningkatkan EFisiensi Mesin Wire Drawing 026 Pada Line Wire Drawing. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (NASKAH PUBLIKASI)
naskah publikasi-Riski.pdf Download (772kB) |
|
PDF (HALAMAN DEPAN)
HALAMAN DEPAN-riski.pdf Download (946kB) |
|
PDF (BAB I)
BAB I.pdf Download (304kB) |
|
PDF (BAB. II)
BAB II-riski.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (BAB III)
BAB III.pdf Restricted to Repository staff only Download (403kB) |
|
PDF (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (794kB) |
|
PDF (BAB V)
BAB V.pdf Restricted to Repository staff only Download (291kB) |
|
PDF (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (392kB) |
|
PDF (LAMPIRAN)
LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (SURAT PERNYATAAN PUBLIKASI ILMIAH)
Surat pernyataan naskah publikasi.pdf Restricted to Repository staff only Download (315kB) |
Abstract
PT. Sumi Indo Wiring Tbk is a company engaged in the processing of metal with production results in the form of cable. The high productivity of the machine in the company of the company is required to maintain the performance of the machine and the quality of the product. Based on historical damage Wire Drawing machines have the highest damage 026, so these machines serve as the object of research. The purpose of the study is to calculate the value of the Overall Equipment Effectiveness (OEE) and perform analysis and provide improvement proposals of improvement by applying the Total Productive Maintenance (TPM). A move made i.e. calculating the OEE and know the biggest factor affecting the value of the OEE calculation with six big losses. After getting the cause of problems make fish bone diagram to determine the remedial proposals to address the six big losses. The OEE calculation based on the average value obtained the Wire Drawing Machine 026 72.5% grades still under 85% JPIM standard. The biggest factor affecting the OEE is Idling/Minor Stoppages Losses amounted to 44.7%, and Reduced Speed Losses amounted to 26.4%. Proposed improvements to enhance the value of OEE, among others, doing training against a worker on the machine so that the knowledge and skills of employees increased, clean the dirty areas before and after doing production, perform preventive maintenance to prevent the occurrence of damage when the engine is operating and budgeting to add or replace a new machinery. In addition the proposed implementation of TPM done to increase the efficiency of a wire drawing machine 026
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | Total Productive Maintenance, Overall Equipment Effectiveness, Fishbone Diagram |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | DOHAN RISKI JONAFAR |
Date Deposited: | 14 Aug 2018 03:39 |
Last Modified: | 14 Aug 2018 03:39 |
URI: | http://eprints.ums.ac.id/id/eprint/66406 |
Actions (login required)
View Item |