Perencanaan Dan Analisis Pembiayaan Penerangan Jalan Umum(PJU) (Studi Kasus: Jl. Tangkil-Ngeluk Kec. Gesi Kab. Sragen)

Khoiriyah, Umi and , Eko Setiawan, ST., MT., Ph.D (2018) Perencanaan Dan Analisis Pembiayaan Penerangan Jalan Umum(PJU) (Studi Kasus: Jl. Tangkil-Ngeluk Kec. Gesi Kab. Sragen). Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
NASKAH PUBLIKASI-Umi-libraryums.pdf

Download (973kB)
[img] PDF (Halaman Depan)
DEPAN.pdf

Download (929kB)
[img] PDF (Bab 1)
BAB 1.pdf

Download (99kB)
[img] PDF (Bab 2)
BAB 2.pdf
Restricted to Repository staff only

Download (610kB) | Request a copy
[img] PDF (Bab 3)
BAB 3.pdf
Restricted to Repository staff only

Download (94kB) | Request a copy
[img] PDF (Bab 4)
BAB 4.pdf
Restricted to Repository staff only

Download (458kB) | Request a copy
[img] PDF (Bab 5)
BAB 5.pdf
Restricted to Repository staff only

Download (152kB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (150kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
pernyataan publikasi.pdf
Restricted to Repository staff only

Download (287kB) | Request a copy

Abstract

The infrastructure of the public street lighting in Sragen district is still not evenly. To avoid accidents and crime along the 2,450 meters and a width of 5 metres of road extending from the village to village Ngeluk Tangkil Subdistrict Gesi Kabupaten Sragen, then required the provision of street lighting. To find out the type of lamps and lighting to suit the function of the way then use SNI 2008. From the results obtained by calculation that many points of light pole is needed as much as 53 points by using LED lights 30 watt and cost investment required i.e. Rp 492,454,800.00. The investment must be completed by the 25th year with attention to the time value of money so that the payment of the Bill every year is different. Street lighting 1.5% tax that is assigned the area taken from the electricity tax customers by PLN, if already suffice to cover the Bills then each customer for 25 years will not increase with each customer Bill of Rp 2,786.91. Keywords: public street lighting, SNI 2008, investment

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: public street lighting, SNI 2008, investment
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
T Technology > TX Home economics
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: UMI KHOIRIYAH
Date Deposited: 09 Apr 2018 06:12
Last Modified: 09 Apr 2018 06:12
URI: http://eprints.ums.ac.id/id/eprint/61554

Actions (login required)

View Item View Item