Pengelolaan Bengkel Teknik Pemesinan SMK Muhammadiyah 2 Sragen

Setyanjadi, Setyanjadi and , Prof. Dr. Bambang Sumardjoko and , Dr. Wafrotur Rohmah, M.M (2017) Pengelolaan Bengkel Teknik Pemesinan SMK Muhammadiyah 2 Sragen. Thesis thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
PUBLIKASI.pdf

Download (462kB)
[img] PDF (Halaman Depan)
HALAMAN DEPAN.pdf

Download (598kB)
[img] PDF (BAB I)
BAB I.pdf
Restricted to Repository staff only

Download (283kB) | Request a copy
[img] PDF (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (486kB) | Request a copy
[img] PDF (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (372kB) | Request a copy
[img] PDF (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (583kB) | Request a copy
[img] PDF (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (264kB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (647kB)
[img] PDF (Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN PUBLIKASI ILMIAH.pdf

Download (19kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy

Abstract

The purpose of this study there are three. First describe the procurement of equipment and materials in the workshop practices Mechanical SMK Muhammadiyah 2 Sragen. Second describing the use of tools and materials in the workshop practices Mechanical SMK Muhammadiyah 2 Sragen. Third describe Maintenance of tools and materials in the workshop practices Mechanical SMK Muhammadiyah 2 Sragen. This type of research is qualitative research with a naturalistic approach. The technique of collecting data through observation, interviews and documentation. The informant as a resource is the principal, vice-principal fields of infrastructure, head of engineering packages mechanical and mechanical engineering practice teacher. The collected data was analyzed by means of data reduction, presentation / display data and drawing conclusions / verification. Testing the validity of using, triangulation source and triangulation techniques. The procurement of tools and materials is divided into 2, the first procurement of inventory of non-consumable equipment is held by a team formed by the Muhammadiyah Primary and Secondary Education Council of Sragen Regency, the second procurement of equipment and consumables by a shopping team formed by the principal. Based on the results of research for the procurement of mechanical engineering workshop equipment is good, but need maintenance equipment on periodically. Similarly, for an inventory of equipment and materials showed the results have not optimal due to the absence of special storage space.

Item Type: Karya ilmiah (Thesis)
Uncontrolled Keywords: pengelolaan, pengadaan, penggunaan dan pemeliharaan alat bahan
Subjects: L Education > L Education (General)
Divisions: Fakultas Pasca Sarjana > Magister Administrasi Pendidikan
Depositing User: Unnamed user with username q100140141
Date Deposited: 01 Feb 2018 07:37
Last Modified: 24 Feb 2018 03:05
URI: http://eprints.ums.ac.id/id/eprint/58630

Actions (login required)

View Item View Item