Rahmanto, Fajar Suryo and , Ir. H. Muhammad Nur Sahid, M.M., M.T. (2017) Perhitungan RAB Gedung Perkantoran 5 Lantai Dengan Prinsip Daktail Parsial Di Wilayah Surakarta. Diploma thesis, Fakultas Teknik Sipil.
PDF (Naskah Publikasi)
Naskah Publikasi FajarSR 2.pdf Download (1MB) |
|
PDF (Lampiran)
Lampiran.pdf Restricted to Repository staff only Download (7MB) | Request a copy |
|
PDF (Pernyataan Publikasi)
PERNYATAAN PUBLIKASI.pdf Restricted to Repository staff only Download (341kB) | Request a copy |
Abstract
The implementation of a construction project is a complex set of work or work mechanisms, layered and interdependent. In addition, the nature of the work is very biodegradable, fragmented and fragmented according to the characteristics and profession of its workers. From the planning of 5-floor office building will be calculated RAB from the structure. The volume of the structure in the form of column volume, beam volume, floor plate volume, wall volume, and ladder volume. Unit price used by AHS in 2017 Surakarta region. From planning of big 5 floor flooring building cost Rp Rp 7.903.730.000,00. the planned time in the structural work is for 18 weeks.
Item Type: | Karya ilmiah (Diploma) |
---|---|
Uncontrolled Keywords: | RAB, volume bangunan, waktu pekerjaan. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | FAJAR SURYO RAHMANTO |
Date Deposited: | 23 Jan 2018 06:41 |
Last Modified: | 23 Jan 2018 06:41 |
URI: | http://eprints.ums.ac.id/id/eprint/58455 |
Actions (login required)
View Item |