Ayu Purnamasari, Diah and , Kuswartomo, S.T, M.T. (2017) Optimasi Pembangkit Listrik Tenaga Air (PLTA) pada Waduk Kedungombo. Skripsi thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
NASKAH PUBLIKASI-195.pdf Download (1MB) |
|
PDF (Halaman Depan)
COVER-5.pdf Download (1MB) |
|
PDF (Bab I)
BAB I PENDAHULUAN.pdf Download (163kB) |
|
PDF (Bab II)
BAB II TINJAUAN PUSTAKA.pdf Restricted to Repository staff only Download (270kB) | Request a copy |
|
PDF (Bab III)
BAB III LANDASAN TEORI.pdf Restricted to Repository staff only Download (550kB) | Request a copy |
|
PDF (Bab IV)
BAB IV METODE PENELITIAN.pdf Restricted to Repository staff only Download (413kB) | Request a copy |
|
PDF (Bab V)
BAB V PEMBAHASAN.pdf Restricted to Repository staff only Download (881kB) | Request a copy |
|
PDF (Bab VI)
BAB VI KESIMPULAN DAN SARAN.pdf Restricted to Repository staff only Download (152kB) | Request a copy |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (220kB) |
|
PDF (Surat Pernyataan Publikasi Ilmiah)
SURAT PERNYATAAN PUBLIKASI ILMIAH.pdf Restricted to Repository staff only Download (333kB) | Request a copy |
|
PDF (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
Abstract
Infrastructure and economic growth gave substantial impact on energy demand. In 2025, energy demand of Indonesia is forecasted to increase 8.4% per year (ESDM, 2016). Most of power plant in Indonesia do not use renewable energy or fossil-fuel, such as petroleum, natural gas and coal. Indonesia has a lot of renewable energy, one of which is hydroelectric power. Kedungombo Reservoir on Rambat Village, Geyer Sub-district, Grobogan District which is between Boyolali and Sragen District. The reservoir is multi-purpose reservoir, irrigation, hydropower, and drinking water. The research will do optimization of hydropower in Kedungombo Reservoir by Non-linear Programming. Formulas is completed with solver in Microsoft excel, make use of reservoir capacity and inflow. The result showed that the hydropower currently generate 1.253.410,40 kW. The hydropower generates 1.514.572,63 kW after optimization or 20,8%.
Item Type: | Karya ilmiah (Skripsi) |
---|---|
Uncontrolled Keywords: | optimization, hydropower, non linier programming |
Subjects: | Q Science > Q Science (General) T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | DIAH AYU PURNAMASARI |
Date Deposited: | 21 Dec 2017 08:03 |
Last Modified: | 21 Dec 2017 08:07 |
URI: | http://eprints.ums.ac.id/id/eprint/57731 |
Actions (login required)
View Item |