Perencanaan Gedung Parkir 4 Lantai Dengan Sistem Rangka Pemikul Momen Biasa (SRPMB)Di Wilayah Surakarta

NUGRAHA PRIMAESTA, DITE and , Yenny Nurchasanah, S.T., M.T. (2017) Perencanaan Gedung Parkir 4 Lantai Dengan Sistem Rangka Pemikul Momen Biasa (SRPMB)Di Wilayah Surakarta. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (NASKAH PUBLIKASI)
OK.pdf

Download (1MB)
[img] PDF (HALAMAN DEPAN)
UP HD.pdf

Download (1MB)
[img] PDF (BAB I)
BAB 1.pdf

Download (99kB)
[img] PDF (BAB II)
BAB 2.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (BAB III)
BAB 3.pdf
Restricted to Repository staff only

Download (446kB) | Request a copy
[img] PDF (BAB IV)
BAB 4.pdf
Restricted to Repository staff only

Download (89kB) | Request a copy
[img] PDF (BAB V)
BAB 5 ATAP.pdf
Restricted to Repository staff only

Download (398kB) | Request a copy
[img] PDF (BAB VI)
BAB 6 PLATTANGGA DAN RAMP.pdf
Restricted to Repository staff only

Download (449kB) | Request a copy
[img] PDF (BAB VII)
BAB 7 ANALISIS BEBAN PORTAL.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (BAB VIII)
BAB 8 PERENCANAAN PORTAL.pdf
Restricted to Repository staff only

Download (318kB) | Request a copy
[img] PDF (BAB IX)
BAB 9 FONDASI.pdf
Restricted to Repository staff only

Download (476kB) | Request a copy
[img] PDF (BAB X)
BAB 10 KESIMPULAN SARAN.pdf
Restricted to Repository staff only

Download (109kB) | Request a copy
[img] PDF (Daftar Pustaka)
DATA SONDIR.pdf

Download (119kB)
[img] PDF (LAMPIRAN)
Lampiran.pdf
Restricted to Repository staff only

Download (17MB) | Request a copy
[img] PDF (Surat Peryataan Publikasi)
surat publikasi dite.pdf
Restricted to Repository staff only

Download (821kB) | Request a copy

Abstract

The city of surakarta especially in urban areas is now growing, thecity aslo got a nick name Spirit of Java whose population is increasing and the level of needs aslo increase. Therefore it will be planned 4 storey parking building with regular moment frame system bearer in the area. The planned structure of the building should consider the security, architectural and economic aspects. Planning parking building refers to the regulation of indonesia national standard. That is SNI 1726.2012, SNI 2847.2013,SNI 1727.2013 and Guidance for planning and operating parking facilities (Ministry of Transportation Republic Indonesia). Planning parking building inculdes columns, beam, plate, stairs,ramps,sloof and foundation. The location of the building is located at Brigjen.Slamet Riyadi road, Laweyan, with clasification of hard soil sites (SC), modification factor respons (R) = 5, building security factor (Ie) = 1. Using concrete quality (f’c) = 25 Mpa, longitudinal reinforcement quality (fy) = 350 Mpa,and shear rainforcemet (fyt) = 300 Mpa. Planning result obtained 150 mm floor plate, 120 mm stair plate, 400/600 mm beam second floor, 350/600 mm thrid floor, 300/550 mm fourth floor, 300/500 mm rooftop, As for the first floor columns 500/550 mm, 450/500 mm second floor, 400/450 mm third floor, 350/400 mm fourth floor. The bottom structure uses pile of 12 m use dimension 200/200 mm, with dimnension pile cap (2000 x 2000 x 800) mm. The planning tool used is SAP 2000,AutoCad and Microsoft office

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: perencanaan, sistem rangka pemikul momen biasa, Gedung parkir
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: DITE NUGRAHA PRIMAESTA
Date Deposited: 13 Oct 2017 06:20
Last Modified: 13 Oct 2017 06:20
URI: http://eprints.ums.ac.id/id/eprint/56055

Actions (login required)

View Item View Item