Perencanaan Gedung Parkir 4 Lantai dengan Sistem Pemikul Rangka Momen Menengah (SPRMM) di Wilayah Surakarta

Imam Hidayat, Arif and , Yenny Nurchasanah, S.T., M.T. (2017) Perencanaan Gedung Parkir 4 Lantai dengan Sistem Pemikul Rangka Momen Menengah (SPRMM) di Wilayah Surakarta. Skripsi thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Naskah Publikasi)
upload naskah- TS.pdf

Download (512kB)
[img] PDF (Halaman Depan)
HAL DEPAN UP.pdf

Download (1MB)
[img] PDF (Bab I)
BAB I.pdf

Download (100kB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (444kB) | Request a copy
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (90kB) | Request a copy
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (398kB) | Request a copy
[img] PDF (Bab VI)
BAB VI.pdf
Restricted to Repository staff only

Download (447kB) | Request a copy
[img] PDF (Bab VII)
BAB VII.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] PDF (Bab VIII)
BAB VIII.pdf
Restricted to Repository staff only

Download (311kB) | Request a copy
[img] PDF (Bab IX)
BAB IX.pdf
Restricted to Repository staff only

Download (471kB) | Request a copy
[img] PDF (Bab X)
BAB X.pdf
Restricted to Repository staff only

Download (109kB) | Request a copy
[img] PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (68kB)
[img] PDF (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (18MB) | Request a copy
[img] PDF (Surat Peryataan Publikasi)
surat pernyataan publikasi.pdf
Restricted to Repository staff only

Download (795kB) | Request a copy

Abstract

The city of Surakarta is geographocally being on the path of strategic traffic economic trade and turism in between Joogjakarta – Surakarta – Semarang – Surabaya, with an administrative area 4.404,06 ha, divided into 5 sub-districts and 51 villages in overall urban areas and has a population 510.077 citizen. Therefore it will be planned 4 storey parking building with medium moment frame system bearer in the area. The planned structure of the building should consider the security, architectural and economic aspects. Planning parking building refers to the regulation of indonesia national standard. That is SNI 1726.2012, SNI 2847.2013,SNI 1727.2013 and Guidance for planning and operating parking facilities (Ministry of Transportation Republic Indonesia). Planning parking building inculdes columns, beam, plate, stairs,ramps,sloof and foundation. The location of the building is located at Brigjen.Slamet Riyadi road, Laweyan, with clasification of hard soil sites (SC), modification factor respons (R) = 5, building security factor (Ie) = 1. Using concrete quality (f’c) = 25 Mpa, longitudinal reinforcement quality (fy) = 350 Mpa,and shear rainforcemet (fyt) = 300 Mpa. Planning result obtained 150 mm floor plate, 120 mm stair plate, 400/600 mm beam second floor, 350/600 mm thrid floor, 300/550 mm fourth floor, 300/500 mm rooftop, As for the first floor columns 500/550 mm, 450/500 mm second floor, 400/450 mm third floor, 350/400 mm fourth floor. The bottom structure uses pile of 12 m use dimension 200/200 mm, with dimnension pile cap (2000 x 2000 x 800) mm. The planning tool used is SAP 2000,AutoCad and Microsoft office

Item Type: Karya ilmiah (Skripsi)
Uncontrolled Keywords: perencanaan, Sistem rangka pemikul momen menengah, Gedung parkir
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: ARIF IMAM HIDAYAT
Date Deposited: 12 Oct 2017 07:37
Last Modified: 12 Oct 2017 07:37
URI: http://eprints.ums.ac.id/id/eprint/56041

Actions (login required)

View Item View Item