Prarancangan Pabrik Asetaldehida dengan Proses Dehidrogenasi Etanol Kapasitas 35.000 Ton/Tahun

Arjiani, Siti Khomariyah and , Ir.Herry Purnama, M.T., Ph.D. and , Ir.Haryanto, AR, M.S (2016) Prarancangan Pabrik Asetaldehida dengan Proses Dehidrogenasi Etanol Kapasitas 35.000 Ton/Tahun. Diploma thesis, Universitas Muhammadiyah Surakarta.

[img] PDF (Bab I)
BAB I.pdf

Download (318kB)
[img] PDF (Bab II)
BAB II.pdf
Restricted to Repository staff only

Download (761kB) | Request a copy
[img] PDF (Bab III)
BAB III.pdf
Restricted to Repository staff only

Download (230kB) | Request a copy
[img] PDF (Bab IV)
BAB IV.pdf
Restricted to Repository staff only

Download (567kB) | Request a copy
[img] PDF (Bab V)
BAB V.pdf
Restricted to Repository staff only

Download (566kB) | Request a copy
[img] PDF (Bab VI)
BAB VI.pdf
Restricted to Repository staff only

Download (442kB) | Request a copy
[img] PDF (Bab VII)
BAB VII.pdf
Restricted to Repository staff only

Download (143kB) | Request a copy
[img] PDF (Daftar Pustaka)
Daftar Pustaka.pdf

Download (154kB)
[img] PDF (Lampiran)
Lampiran.pdf
Restricted to Repository staff only

Download (734kB) | Request a copy
[img] PDF (Pernyataan Publikasi Ilmiah)
Publikasi Karya Ilmiah.pdf
Restricted to Repository staff only

Download (85kB) | Request a copy
[img] PDF (Naskah Publikasi)
Naskah Publikasi (1).pdf

Download (592kB)
[img] PDF (Halaman Depan)
Halaman Depan (baru).pdf

Download (765kB)

Abstract

The manufacturer of acetaldehyde with ethanol dehydrogenation process with capacity of 35.000 tons per year was planned to be established in the Industry Area of Gresik, East Java. This plant was planned to produce acetaldehyde with impurity 99%. The procces to make acetaldehyde in gas phase with operation condition are 260-290 º C and 1,25 atm for the pressure, and catalyst used was Cr2Cu2O5. Reactor that used was fixed bed multitube with condition non isothermal and non adiabatic. The reaction is endothermic so it requires heating dowtherm A. Raw materials is ethanol as much as 4.893,6228 kg/hr. for production process needed water as much as 144.888,5623 kg/hr, and the power needed as much as 287,4674 kW. Fixed capital needed is about IDR 563.716.143.239,2530 and working capital is about IDR 123.237.462.510,5700, based from economic analys, profit before taxes is about IDR 225.402.381.651,7860 per year and profit after taxes is about IDR 157.781.667.156,2500 per year. Precent Return On Investment (ROI) before taxes is 39,99% and after taxes is 27,99%. Pay Out Time (POT) before taxes is 2,00 year and after taxes is 2,63 year. Break Event Point (BEP) is 46,85% and Shut Down Point (SDP) is 27,03%. Discounted Cash Flow (DCF) is 35,90%. Based on the economic analys, it can be concluded that this manufacturer is reasonable and establish.

Item Type: Karya ilmiah (Diploma)
Uncontrolled Keywords: acetaldehyde, dehydrogenation process, fixed bed multitube
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Teknik Kimia
Depositing User: SITI KHOMARIYAH ARJIANI
Date Deposited: 30 Jul 2016 02:09
Last Modified: 30 Jul 2016 02:09
URI: http://eprints.ums.ac.id/id/eprint/44642

Actions (login required)

View Item View Item