Nashruddin, Muhammad and , Emi Erawati, S.T., M.Eng. and , M. Mujiburohman, S.T., M.T., Ph.D. (2015) Prarancangan Pabrik Etilbenzena Dari Etilena dan Benzena Dengan Proses UNOCAL/UOP Kapasitas 200.000 Ton/Tahun. Diploma thesis, Universitas Muhammadiyah Surakarta.
PDF (BAB I)
BAB I.pdf Download (403kB) |
|
PDF (BAB II)
BAB II.pdf Restricted to Repository staff only Download (641kB) |
|
PDF (BAB III)
BAB III.pdf Restricted to Repository staff only Download (304kB) |
|
PDF (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (496kB) |
|
PDF (BAB V)
BAB V.pdf Restricted to Repository staff only Download (390kB) |
|
PDF (BAB VI)
BAB VI.pdf Restricted to Repository staff only Download (385kB) |
|
PDF (Daftar Pustaka)
DAFTAR PUSTAKA.pdf Download (135kB) |
|
PDF (Lampiran)
Lampiran_Menara Distilasi.pdf Restricted to Repository staff only Download (571kB) |
|
PDF (Halaman Depan)
Halaman Depan.pdf Download (655kB) |
|
PDF (Naskah Publikasi)
Naskah Publikasi.pdf Download (680kB) |
|
PDF (Surat Pernyataan Publikasi)
surat pernyataan publikasi.pdf Restricted to Repository staff only Download (220kB) |
Abstract
Ethylbenzene plant design capacity of 200,000 tons per year from ethylene and benzene will use the Unocal/UOP process using Fixed Bed Reactor Multitube with an operating temperature of 180-199.94oC and pressure of 5 atm. The reaction takes place in the phase of preparing ethylbenzene gases, irreversible, and in non-isothermal conditions. The factory is planned to operate for 330 days a limited liability company (PT). Raw material needs for the manufacture of ethylbenzene from ethylene and benzene each as much as 6,696.8853 kg/h and 18,583.0945 kg/hour. Ethylene raw material obtained from PT Chandra Asri Petrochemical Center is capable producing 522,000 tons of ethylene per year, while benzene raw material obtained from Pertamina UP IV Cilacap which has a capacity of 120,000 tons per year and it is possible capacity additions. The resulting ethylbenzene production as much as 25,252.52525 kg / hour. In the process of preparing ethylbenzene as much water as needed 375,027.81 kg/hour to meet the needs of cooling water, 71,091.9896 kg/h for steam, and as much 2399.3050 kg/hr for water sanitation. Ethylbenzene factory will be established in the Cilegon Industrial Estate, Banten, West Java, namely on highway Anyer and will be built on a land area of 28 060 m2, the number of employees as much as 122 people. To establish this ethylbenzene plant needed fixed capital of Rp 713,058,447,472.00 and requires working capital of Rp 368,200,579,411.00 and will make a profit of Rp 203,158,558,665.00 after a tax of 30% of profit before tax amounting to Rp 290,226,512,379.00. Thus obtained precent return on investment (ROI) before tax of 40.70% and after tax amounted at 28.49%. Pay out time (POT) before tax and after tax is for 1.97 years and 2.60 years. Break Even Point (BEP) of 59.30%, shut down point (SDP) of 46.75%, while discounted cash flow (DCF) of 56.12%. Judging from the economic feasibility analysis taking into account the price of ROI, POT, BEP, SDP, for plants with low risk can be concluded that ethylbenzene plant is feasible to set up. Keywords: ethylbenzene, the process of UNOCAL / UOP, Fixed Bed Multitube
Item Type: | Karya ilmiah (Diploma) |
---|---|
Uncontrolled Keywords: | Etibenzena, proses UNOCAL/UOP, Fixed Bed Multitube |
Subjects: | Q Science > QD Chemistry |
Divisions: | Fakultas Teknik > Teknik Kimia |
Depositing User: | Muhammad Nashruddin |
Date Deposited: | 30 Jul 2015 06:46 |
Last Modified: | 01 Aug 2016 02:42 |
URI: | http://eprints.ums.ac.id/id/eprint/35295 |
Actions (login required)
View Item |