Fathoni, Ridlo Nur and , Dr. Ir. Dhani Mutiari, MT. and , Dr. Ir. Qomarun, MM. (2024) Pengaruh Risiko Cost Overrun Terhadap Biaya Akhir Proyek Pembangunan Gedung Di Pemerintahan Kabupaten Boyolali (Tahun Anggaran 2013-2020). Thesis thesis, Universitas Muhammadiyah Surakarta.
PDF (Naskah Publikasi)
1. NASKAH PUBLIKASI.pdf Download (236kB) |
|
PDF (Halaman Depan)
2. HALAMAN DEPAN.pdf Download (4MB) |
|
PDF (Bab-I)
bab 1.pdf Download (1MB) |
|
PDF (Bab-II)
bab 2.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (Bab-III)
bab 3.pdf Restricted to Repository staff only Download (1MB) |
|
PDF (Bab-IV)
6. bab 4 baruuu.pdf Restricted to Repository staff only Download (10MB) |
|
PDF (Bab-V)
bab 5.pdf Restricted to Repository staff only Download (748kB) |
|
PDF (Daftar Pustaka)
lembar daftar pustaka.pdf Download (559kB) |
|
PDF (Lampiran)
lembar lampiran.pdf Restricted to Repository staff only Download (2MB) |
|
PDF (Surat Pernyataan Publikasi)
surat pernyataan publikasi.pdf Restricted to Repository staff only Download (357kB) |
Abstract
Cost overrun occurs due to factors affecting cost components that often escape control, so there is a tendency to increase as a result of weak control by the company, either from the planning consultant or the Public Works and Spatial Planning Office (DPUPR). The purpose of this study was to determine the effect of cost overrun risk on the final cost of building construction projects in the Boyolali Regency government. The research method used is descriptive method. The survey results in the form of interviews and questionnaires from experts and respondents were processed with parametric analysis, statistical methods with descriptive analysis, correlation analysis, and regression analysis. The result of this study is to determine the cost overrun risk variables that have the most influence on the final cost performance of building construction projects in the Boyolali Regency Government, namely the problem of unavailability and foreign currency fluctuations and the acceleration of the schedule and given recommendations for action to control it.
Item Type: | Thesis (Thesis) |
---|---|
Uncontrolled Keywords: | cost overrun, descriptive, kinerja, biaya |
Subjects: | Q Science > Q Science (General) T Technology > TA Civil Engineering Z Bibliography. Library Science. Information Resources > ZA Information resources > ZA4450 Databases |
Divisions: | Fakultas Pasca Sarjana > Magister Teknik Sipil |
Depositing User: | Unnamed user with username s100200009 |
Date Deposited: | 13 Aug 2024 04:34 |
Last Modified: | 13 Aug 2024 04:34 |
URI: | http://eprints.ums.ac.id/id/eprint/126511 |
Actions (login required)
View Item |